Similar Projects
AMI Metering System (Contract C)
Post-Bid
Linden, AL

Water System Improvements (Contract A)
Post-Bid
Linden, AL

Utility Relocation on John Findlay Drive at Oak Mountain State Park
Results
Less than $350,000 est. value
Columbiana, AL

Small Diameter Water Main Replacement
Results
Less than $500,000 est. value
Gadsden, AL

Routt Road-Liberty Hill Water Main Installation
Post-Bid
Huntsville, AL

Construction of Industrial Park Phase II Water Improvements
Results
Pelham, AL

Water Main Relocation at Brookside Drive Bridge
Post-Bid
Dothan, AL

Water Main Upgrades
Results
AL

2,860 Linear Feet of 24' Ductile Iron Pipe
Post-Bid
Bessemer, AL

Water Transmission Main Replacement
Results
Less than $300,000 est. value
Pine Hill, AL

Cleveland Roundabout Utility Relocation
Post-Bid
Cleveland, AL

Water Main Extension at Cutler Avenue and West River Road
Results
Less than $304,375 est. value
Mentone, AL

Water Main Replacement
Post-Bid
Decatur, AL 35609

Stormwater Drain Pipe Replacement
Results
Roanoke, AL

Installation of Water Mains and Appurtenances
Post-Bid
Birmingham, AL

Last Updated 12/05/2018 01:58 PM
Project Title

43--SERVICES: 619-18-3-5243-0304 - Repair piping North Vault (VA-18-00085219)

Physical Address View project details and contacts
City, State (County) Montgomery, AL 361093798   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Contractor will furnish, deliver and set up the material and labor necessary for the completion of replacing piping to both pumps in the north vault. Contractor will replace piping from the discharge side of pump #1 to two-inch tee at manifold, including flex, union, isolation valve, and fittings. Contractor will replace 3 x 2.5 reducer at suction side of pump. Contractor will replace piping from the discharge side of pump #2 from flex to two-inch tee of manifold, including unions, checks, and fittings. Contractor will install hangers as needed to make repairs. VA personnel will drain and fill the system prior to the contractor starting work and after contractor has completed the work. Contractor must stay onsite during filling of system to check for leaks. It is highly recommended that potential contractors visit and survey the site before placing a bid. Contractor will dispose of any trash or material in dumpster located by building 14.
Details
Division 22 - Plumbing, Common Work Results for Plumbing, Facility Storm Drainage, Sump Pump Discharge Piping.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents