Similar Projects
San Sebastian Inland Harbor
New Construction - 50,118 SF
Conception
$80,000,000 est. value
Saint Augustine, FL

Coronado Island Marine Village
New Construction
Conception
New Smyrna Beach, FL 32169

Bay Harbour Marina Village
New Construction - 30,000 SF
Design
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

One Island Park
New Construction
Design
Miami Beach, FL

County Beach Access Construction
Term Contract
Post-Bid
$280,000 est. value
Saint Petersburg, FL 33716

Specifications For Marathon Boat Ramp Modification Project
Term Contract
Post-Bid
Marathon, FL 33050

Municipal Marina Yacht Basin Structural Rehabilitation
Results
Saint Petersburg, FL 33701

Construct a Pavilion Deck and Various Boardwalk Deck and Railing Repairs
Results
Lantana, FL

Love Street Development
New Construction, Build-Out - 27,950 SF
Construction
$30,000,000 est. value
Jupiter, FL 33477

Fort Laudredale Boatyard and Marina
Renovation
Construction
$1,100,000 est. value
Fort Lauderdale, FL 33312

Marina at Deadman's Bay
New Construction
Pending Verification
Steinhatchee, FL

Mack Yacht Services
New Construction
Conception
Stuart, FL 34997

Port 32 Palm Beach Gardens
New Construction, Demolition - 30,885 SF
Design
Palm Beach Gardens, FL 33418

Sombrero Beach Irma Recovery Project
Results
Marathon, FL

Cordova Boat Club
New Construction - 51,230 SF
Construction
$7,000,000 est. value
Fort Lauderdale, FL 33300

Last Updated 04/12/2019 10:39 AM
Project Title

Design-Build Project for Dinner Key Marina and Restoration Project

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Entertainment/Recreation
Sub-Category(s) Beach Facility/Marina
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $15,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The City of Miami Dinner Key Marina is located at 3400 Pan American Drive. The marina consists of 9 piers with fixed concrete docks and approximately 582 wet slips. Piers 1-7 are fixed docks that are generally in an easterly orientation from the western shoreline of Biscayne Bay. Piers 8 and 9 are along the bulkheads, at the southern third of the marina area. The marina in its current configuration was constructed in the late 1980's, and it was extensively damaged by Hurricane Andrew in 1992. The marina was repaired/restored after Andrew and, the marina was again damaged by Hurricane Wilma in 2005. The eastern end of Pier 3 had to be reconstructed after that, and gates/locks and fiberglass grating were also installed throughout the marina. Recently in September 2017, the marina suffered damages caused by Hurricane Irma. The scope of work of the project includes, but is not limited to, repairs or replacement of areas damages by hurricane Irma (e.g. concrete structures, wooden fingers and piles, fiberglass grating, sewer pump-out room/system, etc.), repair damages due to deterioration (e.g. concrete structure, dock entrance canopies, wooden piles, etc.), and to replace and/or upgrade all utilities (e.g. electrical, water, fire protection, fire alarm, CCTV, piers' pedestals, etc.). The detailed and complete scope of work of the project will be included in the Request for Proposal (RFP) and in the Design Criterial Package.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes, Tiling.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Lockers.
Division 26 - Electrical, Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 35 - Waterway and Marine Construction.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents