Similar Projects
Roof Replacement and Associated Work at The Community Elementary School - Sub Bid
Sub-Bidding
$1,400,000 est. value
North Attleborough, MA 02760

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

UMASS Dartmouth Woodland Commons Rooftop Unit Replacement
Post-Bid
$149,000 to $150,000 est. value
Dartmouth, MA 02747

HVAC Preventative Maintenance
Results
Taunton, MA 02780

Fairhaven Recreation and Senior Center HVAC Improvements - Phase 1 - General Bid
Results
$236,500 est. value
Fairhaven, MA

Residential Weatherization Work
Post-Bid
Fall River, MA 02720

Laundry Room Conversion in Sunset Hill Housing Development - Filed Sub Bid
Renovation
Results
Less than $160,000 est. value
Fall River, MA 02724

HVAC Replacement of the Head Start School
Post-Bid
Fall River, MA

Cardinal Medeiros Towers - Community Space HVAC Upgrades Project
Results
$130,000 est. value
Fall River, MA 02721

Furnace Coil Condenser Replacement at Dighton Town Hall
Post-Bid
Dighton, MA 02715

HVAC System Replacement at the District 5 Administration Building
Results
Less than $380,000 est. value
Taunton, MA 02718

HVAC Installation Sherman Substation Building 2
Post-Bid
Less than $24,999 est. value
North Attleborough, MA

On-Call Routine and Emergency Heating System Response and Repair Work
Term Contract
Results
Less than $96,500 est. value
New Bedford, MA 02740

Replacement of the HVAC Condenser at the Council on Aging Building
Post-Bid
$30,000 est. value
Swansea, MA 02777

Fairhaven Recreation and Senior Center HVAC, Improvements - Phase 2
Results
Less than $250,000 est. value
Fairhaven, MA 02719

Reported 01/07/2021 12:00 AM
Project Title

Replacement of Rooftop Unit

Physical Address View project details and contacts
City, State (County) New Bedford, MA   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from Copy Center - 12/16/20
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. This project consists of the direct replacement of a 19-year old packaged rooftop unit (AC-31) and a 45-year old indoor air handling unit (AC-26), which have reached the end of their service life.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents