Similar Projects
Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$1,500,000 CJ est. value
Stillwater, OK 74074

Block 34 Park Improvements Project
Infrastructure
Bidding
$13,500,000 CJ est. value
Stillwater, OK 74074

Cushing Municipal Authority Clarifier Vault Piping Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Cushing, OK 74023

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Resurface (Asphalt) - SH-51
Infrastructure
Results
$1,717,000 CJ est. value
Stillwater, OK 74074

Dutch Bros / Stillwater
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Stillwater, OK 74074

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Full Conversion Crude Oil Refinery Development / Chicago
New Construction, Infrastructure
Pending Verification
$5,560,000,000 CJ est. value
Cushing, OK 74023

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

Cooling Tower Replacement
Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Cushing, OK 74023

Club Car Wash / Stillwater
New Construction, Infrastructure - 5,671 SF
Post-Bid
$1,300,000 CJ est. value
Stillwater, OK 74075

Bridge Rehabilitation - US-177
Infrastructure
Results
$931,277 CJ est. value
Stillwater, OK 74074

Last Updated 09/12/2023 01:34 AM
Project Title

Recovered Water Pump Station and Finished Water Pump Station

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74075   (Payne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $43,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Stillwater Utilities Authority (SUA) will utilize a two-step bidding process to select a successful bidder for this project as follows: Step 1: PREQUALIFICATION REQUIRED - Prospective bidders must complete and submit a Statement of Qualifications for all work to be performed for the project. This includes identifying and submitting qualifications for proposed subcontractors to be used to complete portions of the work identified in the Instructions to Bidders. Bids received from prospective bidders that are not prequalified will not be accepted and will be returned unopened. Step 2: PREQUALIFIED BIDDERS SUBMIT A BID - Prospective bidders that have been deemed qualified must complete and submit a bid in accordance with the bidding requirements. Bids shall be opened and read aloud at the above stated time for receipt of bids. Bid opening will occur in Room 1112 "B" of the Municipal Building, 723 South Lewis, Stillwater, Oklahoma, 74074. Statements of Qualifications and Sealed Bids will be received electronically through website by the due dates listed above. To register for the City's online bidding portal, visit website. Statements of Qualifications and Bids shall be submitted as stated in the Instructions to Bidders. Any bid received by the City Clerk more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, or any bid so received after the time set for opening of bids, shall not be considered and shall be returned unopened to the bidder submitting same. Statements of Qualifications and Bids will be referred to city staff for evaluation. The SUA may award to the "lowest and best responsible bidder". The SUA reserves the right to reject any or all bids or portions thereof and to waive any technicalities in the bidding process. No bid may be altered, withdrawn, or resubmitted within 45 days after the date set for the opening of bids. Questions regarding the bid package should be directed to Chris Humes at chris.humes@stillwater.org and Erika Cooper, P.E. at ecooper@carollo.com. The successful bidder shall execute a contract within 14 days of Notice of Award by the city. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. Any agreement entered into as a result of this invitation to bid shall be construed under the laws of the State of Oklahoma, and the venue for enforcement of the agreement shall be Payne County in the State of Oklahoma. The SUA may issue addenda as may be necessary in the best interest of the public and the SUA. Addenda may amend the date and/or time for receipt of bids. or any specification, item, document, or requirement in the Bidding Documents upon notice to all prospective bidders who signed the sign-in sheet at the Pre-Bid Conference. This project is to be financed by a loan from the Oklahoma Water Resources Board through the Department of Environmental Quality Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF Project No. P40-1021220-05. A "Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications." B. "Each bidder must fully comply with the requirements, terms and conditions of the Oklahoma Department of Environmental Quality (DEQ), Small, Minority, Women's Businesses Requirements including affirmative steps to contract with small, minority and women's businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women's businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Question Cuttoff Date & Time 9/6/2023 06:00:00 PM (ET) All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents