Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Construction Manager at Risk Services for Pump Station 5 and Proctor Road
Renovation
Bidding
Sarasota, FL 34249

Lift Station S-19 Replacement
Renovation
Bidding
Melbourne Beach, FL 32951

Lift Station No. 6 Relocation and Collection System Improvements
Renovation
Post-Bid
Mulberry, FL 33860

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Odor Control Units - Preventative Maintenance and Repairs
Renovation, Term Contract
Bidding
Kenneth City, FL 33709

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Irrigation Pump Station Replacement and Modification
Renovation
Bidding
Estero, FL 33928

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Last Updated 12/10/2021 03:27 AM
Project Title

As-Needed Pump Station Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Port Richey, FL 34668   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete pump station rehabilitation work as needed including but not limited to any excavation equipment required for tie-ins, pipework, and lid removal (concrete). Contractor shall perform the work complete, in place and ready for continuous service, and will include repairs, testing, clean up, replacements and restoration required as a result of damages caused during this construction.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents