Similar Projects
Phase 1A Liner Construction Project at the Landers Sanitary Landfill
Infrastructure
Bidding
$5,000,000 est. value
San Bernardino, CA

Department of Waste Management and Recycling (DWMR) Job Order Contract (JOC)
Infrastructure
Bidding
Sacramento, CA

Contractors Panel at the Riverside Regional Water Quality Control Plant, Citywide Sewer/Storm Drain Collection System and Tequesquite Landfill
Term Contract
Post-Bid
Riverside, CA

Landfill Disposal Site Services
Infrastructure
Post-Bid
CA

Landfill Gas Treatment System Upgrade
Infrastructure
Results
$350,000 est. value
Upland, CA 91786

Davenport Park Landfill Gas Control System
Alteration
Results
$1,300,000 est. value
Long Beach, CA 90899

Construction of Waste Management Unit 6H Base Liner System
Infrastructure
Post-Bid
$6,161,416 est. value
Woodland, CA 95776

Landfill Disposal Site In Los Angeles County
Term Contract
Results
CA

Landfill Disposal Site Services for Toll Bridge Region
Infrastructure
Post-Bid
CA

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Results
CA

Landfill Disposal Site Services
Infrastructure
Post-Bid
CA

Landfill Gas System Modifications
Infrastructure
Results
$586,000 to $645,000 est. value
Linden, Lodi, CA 95240

Landfill Disposal Site Services
Infrastructure
Post-Bid
CA

Landfill Gas System Support
Infrastructure
Results
Woodland, CA 95776

Landfill Gas Collection and Control System Expansion
Infrastructure
Post-Bid
$390,000 est. value
Burbank, CA

Last Updated 07/14/2022 08:39 AM
Project Title

Module 5, Phase D Liner System

Physical Address View project details and contacts
City, State (County) Oroville, CA   (Butte County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,152,547 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Specifications and Plans to Which Special Reference Is Made, as Follows: Module 5, Phase D Liner System the Work, in General, to Be Done Under This Contract Consist of, but Is Not Limited to Preparing the Subgrade for Construction of the Landfill Liner, Placement of General Fill, Furnishing and Installing Landfill Liner Components and Related Items, Furnishing and Installing Landfill Gas Collection Piping and Related Items, Electric Leak Location Services, and Traffic Control, Within the Limits of Module 5, Phase D All in Conformance With the Standard Specifications, and These Special Provisions, Unless Specified Herein, and Shall Include the Furnishing of All Tools, Equipment, Materials, Supplies, Incidentals, and Manufactured Articles for the Project, All in Conformance With State of California, Department of Transportation 2018 Standard Specification and Standard Plans, Butte County Standard Details, and the Attached Contract Specifications and the Details as Shown on the Contract Plans Entitled Module 5, Phase D Liner System.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents