Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

2022 Steel Main Replacement
Infrastructure
Bidding
$1,000,000 est. value
East Wenatchee, WA

Construction Management Services
Alteration
Bidding
Bremerton, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

2022 Utility Replacement Project
Infrastructure
Bidding
$300,000 est. value
Edmonds, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Kansas Street Southwest Outfall Replacement and Calistoga Street West Improvements Project
Infrastructure
Bidding
$350,000 est. value
Orting, WA 98360

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

East McBryde Avenue Sidewalk - Church to Calder
Infrastructure
Bidding
$330,000 est. value
Montesano, WA 98563

Reported 04/29/2022 12:00 AM
Project Title

SWR - 92nd Avenue NE Forced Relocation

Physical Address View project details and contacts
City, State (County) Everett, WA 98208   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $107,200 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this project includes but is not limited to: Installation of approximately 600 linear feet of eight-inch ductile iron water main and associated fittings; 1 new fire hydrant assembly and appurtenances. The project also includes connection to an existing two inch water services, removal of existing valving and a hydrant, asphalt trench patching, private asphalt driveway restoration, erosion control and landscape/surface restoration. The primary purpose of the proposed project is to relocate an existing water main to accommodate roadway improvements that are part of a larger WSDOT project. Construction shall be performed while maintaining service to the existing water system. Access to the work site is from 4th St. NE, near the City of Lake Stevens, in Snohomish County, Washington.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents