Similar Projects
RFQ D/B - Replace 13.8KV Overhead Circuits 1E&2E
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Rock Island, IL

36th Street and 8th Avenue Reconstruction
Infrastructure
Bidding
$400,000 est. value
Moline, IL

Earth Ex, Driveway Pavement
Infrastructure
Bidding
$600,000 est. value
Andalusia, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Hot Poured Joint Sealer
Post-Bid
IL

Pavement patching on 1-74/280, weigh scales, EB 1 mile East of and WB 3.3 miles East of the l-74/ I-280/ US 6 Interchange
Results
IL

6th Street Reconstruction
Results
Moline, IL 61265

Perform Digital Pavement Condition Assessments of Existing Pavement
Infrastructure
Post-Bid
Moline, IL

Runner's Park Sunshade
Results
East Moline, IL

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

2021 Sealcoat Program
Results
Moline, IL

Engineering Services for 30th Street Resurfacing
Infrastructure
Post-Bid
Rock Island, IL 61201

14th Avenue Reconstruction
Results
East Moline, IL 61244

Engineering Services for 31st Avenue Resurfacing
Infrastructure
Post-Bid
Rock Island, IL

Reconstruct Existing Streets
Results
Rock Island, IL 61201

Last Updated 07/06/2022 07:57 AM
Project Title

Bike Path Overlay Phase II off Route 84

Physical Address View project details and contacts
City, State (County) Port Byron, IL 61275   (Rock Island County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $227,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Mobilization, Seeding, Class 1, Bituminous Surface Removal, Aggregate Base Course, Type B 6", Hot-Mix Asphalt Surface Course, Mix "D", N50, 1 1/2", Hot-Mix Asphalt Base Course, 2 1/2", Bituminous Materials (Prime Coat), Milling, Variable Depth 0" - 1.5", Temporary Construction Access. Each Bidder shall provide either IL DOT Certificate of Eligibility or a list of two similar projects in size and scope for work specified in proposal to be eligible to receive proposal booklet and bid on the project. All bids must be submitted on these forms and returned in a sealed envelope marked with the project title Cordova Township Park District-Bike Path Overlay Phase II. The Cordova Township Park District reserves the right to reject any bids and to waive technicalities or irregularities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents