Similar Projects
Rainbow Valley Final Planned Area Development
New Construction
Conception
$2,000,000,000 est. value
Goodyear, AZ 85338

Hawes Crossing - Master Plan
New Construction
Conception
Mesa, AZ 85212

Wylde Salon
Build-Out
Design
$36,740 est. value
Gilbert, AZ 85296

Gentry on The Green
New Construction, Demolition - 156,000 SF
Design
$375,000,000 est. value
Scottsdale, AZ 85251

Multi-Tenant - Surprise, AZ
Renovation - 62,842 SF
Post-Bid
Surprise, AZ

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Construct New Roadway
Results
Less than $130,000,000 est. value

Walmart Supercenter #5768-219
Renovation - 84,242 SF
Construction
$502,815 est. value
Tempe, AZ 85282

Apache Rock Apartments f/k/a Daybreak Apartments
New Construction - 75,193 SF
Construction
$3,500,000 est. value
Tempe, AZ 85281

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

AutoZone #2907
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Mesa, AZ 85208

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Redevelopment of Site Known
Post-Bid
Chandler, AZ 85225

Construction Administration TT0342, McKellips Road SR 101 to Alma School Road
Results
Phoenix, AZ 85009

Last Updated 08/16/2022 07:02 PM
Project Title

Dobson Road Commercial Development

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85202   (Maricopa County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation.
Project Status Obtained from a News Source, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a commercial development. An architect has been selected. As of August 16, 2022 construction is underway. General contractor information has not been disclosed.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents