Similar Projects
Great Miami River Recreation Bike Trail - State of Ohio
Addition, Infrastructure
Conception
Less than $500,000 est. value
Moraine, OH 45439

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Rugby and Sunny view Plat Improvements
Infrastructure
Post-Bid
$265,355 est. value
OH

Center Street Improvements Phase 4
Infrastructure
Post-Bid
$375,000 est. value
Farmersville, OH 45325

2021 Street Overlay Program
Results
Clayton, OH

2021 Street Improvement Project
Results
$1,300,000 est. value
Dayton, OH

Preschool/Pediatric Dental Clinic
Renovation - 6,387 SF
Construction
Dayton, OH 45406

Trinity Community at Beavercreek - United Church Homes
Addition, Demolition, Infrastructure - 168,000 SF
Pending Verification
$8,000,000 CJ est. value
Beavercreek, OH 45440

The Foodbank Expansion
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$5,188,349 CJ est. value
Dayton, OH 45417

Blosser Street Reconstruction Phase 1
Infrastructure
Design
$614,965 CJ est. value
New Lebanon, OH 45345

Mt. Crest Parking Lot & Sidewalk Replacement
Renovation
Post-Bid
Dayton, OH 45403

Removal and Replacement of Certain Curbs and Sidewalks project
Results
Vandalia, OH

Carriage Trails Phase VII
New Construction, Infrastructure
Pending Verification
$19,565,000 CJ est. value
Huber Heights, OH 45371

Bridge Preservation
New Construction, Demolition, Infrastructure
Design
$343,000 est. value
Riverside, OH 45431

Last Updated 11/07/2022 11:36 AM
Project Title

Lincoln Hill Child and Family Center

Physical Address View project details and contacts
City, State (County) Dayton, OH 45410   (Montgomery County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Pre-School/Daycare, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new child development center with classrooms, a kitchen, health clinic, and training space. As of November 7, 2022, an architect and a general contractor have been selected. The construction timeline is unknown at this time. *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, 29,558 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents