Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Results
$4,905,999 CJ est. value
Reno, NV 89502

2021 Small Diameter Water Main Replacement - Contract B
Infrastructure
Results
$20,200,000 est. value
Pittsburgh, PA

JPMorgan Chase - East Liberty Branch / Pittsburgh
New Construction, Infrastructure - 3,075 SF
Construction
$1,600,000 CJ est. value
Pittsburgh, PA 15206

JPMorgan Chase - East Liberty Branch / Pittsburgh
New Construction, Infrastructure - 3,075 SF
Construction
$1,600,000 CJ est. value
Pittsburgh, PA 15206

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Oakland Crossing Mixed-Use Development / Pittsburgh
New Construction, Infrastructure
Pending Verification
$370,000,000 CJ est. value
Pittsburgh, PA 15219

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CD 47 Area Wide Street Reconstruction
Infrastructure
Results
$25,000 est. value
Wall, PA

Last Updated 12/28/2023 10:05 AM
Project Title

RFP D/B - I-79, Campbells-Moon Run

Physical Address View project details and contacts
City, State (County) Kennedy Township, PA 15136   (Allegheny County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $14,973,873 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Traffic Control Plan for the Bituminous Milling and Resurfacing, Concrete Pavement Patching, Drainage, Guide Rail and Barrier, Signing and Pavement Marking, Bridge Preservation, Painting Structural Steel, and Other Miscellaneous Construction, All Within a Length of 26,600 Linear Feet (5.038 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 0079, Section A53 (Raymond P. Shafer Highway) and State Routes 8009 and 8011, in Allegheny County, Robinson and Kennedy Townships, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 200 Feet South of the I-79/i-376 Interchange at Segment 0580/0581 Offset 0589/0671 (Station 450+90/451+00) to a Point Approximately 3,450 Feet North of the I-79/sr 0060 Interchange at Segment 0604/0605 Offset 0856/0950 (Station 585+17/586+05) in Allegheny County. Project Cost Range: $15,000,000.00 - $19,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 26.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Concrete Pavement Rehabilitation Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - I-79, Campbells-Moon Run *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents