Similar Projects
Region 4,GSA PBS, Design-Build Concrete and Crack Water Fountain Repairs, Fort Lauderdale, FL
Design
$500,000 to $1,000,000 est. value
Fort Lauderdale, FL 33301

Tampa Red Brick Exterior Remediation
Bidding
$500,000 to $575,000 est. value
Tampa, FL 33606

Highridge Family Center - Painting and Weatherproofing
Bidding
West Palm Beach, FL 33407

Four Points Youth Services Second Floor Interior Renovations
Renovation
Sub-Bidding
Palm Beach, FL

Solar and Roller Shades for Senior Centers
Post-Bid
Less than $26,440 est. value
Tampa, FL 33601

Concrete Driveway Apron and Collar Restoration
Term Contract
Post-Bid
Okeechobee, FL 34972

North Terminal Water Intrusion
Results
Less than $760,000 est. value
Miami, FL 33159

Beardall Structural Repairs
Results
Orlando, FL 32801

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

Waterproofing Services
Alteration
Bidding
$6,000,000 est. value
Tampa, FL 33619

Pensacola International Airport Terminal Joint Repairs
Post-Bid
Pensacola, FL 32502

Concrete Pipe
Term Contract
Results
Daytona Beach, FL 32720

Porter Transfer Station Tipping Floor and Push Wall Armor Replacement
Alteration
Bidding
$877,000 est. value
Orlando, FL 32818

MC Jail Shower Remodels
Post-Bid
Ocala, FL 34475

Tub and Shower Wall Replacement with Walk in Shower
Results
Less than $17,222 est. value
Gainesville, FL 32601

Last Updated 06/08/2021 08:47 AM
Project Title

Thrasher-Horne Center Slab Repair Project-Orange Park Campus

Physical Address View project details and contacts
City, State (County) Orange Park, FL 32065   (Clay County)
Category(s) Single Trades
Sub-Category(s) Concrete, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of removing the existing flooring and floor/wall mounted plumbing fixtures, partition walls, countertops, base cabinets, storage cabinets, etc. in the spaces indicated. The existing sunken concrete slab in these areas will be raised using a foam injection application. After the slab is lifted, the contractor will install new flooring as specified, and reinstall all existing plumbing fixtures, partition walls, countertops, base cabinets, storage cabinets, etc. that are scheduled to be reinstalled. Contractor shall monitor and repair any conditions that arise from the slab leveling process. All other existing areas not shown to have any work performed shall be protected from construction activities.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 09 - Finishes, Flooring.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents