Similar Projects
Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Conception
$50,000,000 est. value
Seward, AK 99664

China Poot Bay Lodge and Restaurant / Homer
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Homer, AK 99603

Sewer System Installations
Infrastructure
Bidding
$200,000 CJ est. value
Kenai, AK 99611

Sewer System Installations
Infrastructure
Bidding
$200,000 CJ est. value
Kenai, AK 99611

RFP Design - Achemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

North Road Surfacing
Infrastructure
Results
Kenai, Seldovia, AK 99669

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

New Multi-Purpose Community Center - City of Homer
New Construction, Infrastructure
Pending Verification
$23,044,210 CJ est. value
Homer, AK 99603

New Multi-Purpose Community Center - City of Homer
New Construction, Infrastructure
Pending Verification
$23,044,210 CJ est. value
Homer, AK 99603

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

RFQ D/B - HERC 2 - Hazardous Materials Abatement
Term Contract, Infrastructure
Bidding
$260,000 CJ est. value
Homer, AK 99603

Sterling Highway Mp 45-60 Sunrise to Skilak Lake Rd Reconstruction CM/GC
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
AK

Gravel Road Design - Duke Street, St. Andrews Road; Sports Lake Road; Hakala Drive; Cotman Court
Infrastructure
Results
$86,011 est. value
Soldotna, AK 99669

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Last Updated 09/13/2022 07:04 PM
Project Title

Gravel CIP - Sport Lake Road / Hakala Drive / Cotman Court

Physical Address View project details and contacts
City, State (County) Soldotna, AK 99669   (Kenai Peninsula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Kenai Peninsula Borough hereby invites qualified firms to submit a firm price for acceptance by the Borough for ITB23-011 Sport Lake Road Gravel CIP. The project consists of the following: Furnishing all labor, materials and equipment to upgrade Sport Lake Road / Hakala Dr / Cotman Ct. Work includes but is not limited to roadbed widening, subgrade modification, embankment construction, drainage, ditching and clearing. This contract is subject to the provision of State of Alaska, Title 36, Minimum Wage Rates. The subsequent contract will require certificates of insurance and may require performance and payment bonds. Q&A DEADLINE: SEPTEMBER 7, 2022 BY 5:00 PM.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents