Similar Projects
Last Updated | 03/02/2023 04:18 PM |
Project Title | Central Elementary School Addition and Renovation Middle School Addition and Renovation - BP 3 Glazing |
Physical Address | View project details and contacts |
City, State (County) | Alleman, IA 50007 (Polk County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Package 3 Glazing This contractor shall furnish all the labor and material necessary to install complete safety and security systems for the building. B. This contractor shall furnish all the labor and material to install a complete safety and security system in the new building. The system shall include all items of work as outlined in these specifications and on the drawings. C. All work shall be performed by a well-qualified and licensed technician with a thorough knowledge of the various systems involved in this building. It shall be this contractors responsibility to see that their electricians are familiar with all the various codes and tests applicable to this work. All equipment shall be new and of the type specified by the engineer unless otherwise noted in these specifications or on the drawings to remain and or be reused.The intent of the specifications and drawings is for complete installation of the systems outlined in the specifications and drawings so that at the conclusion of construction the system will be turned over to the owner complete and ready for safe and efficient operation. This contractor is required to furnish and install all such items normally included on systems of this type, which, while not mentioned directly herein or on the drawings are obviously essential to the installation and operation of the system and which are normally furnished on quality installation of this type. The specifications and drawings cannot deal individually with the many minute items that may be eventually required by the nature of the systems. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |