Similar Projects
SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR 334 From SR 15 to SR 98
Infrastructure
Design
$4,000,000 CJ est. value
Commerce, GA 30530

SR 334 From SR 15 to SR 98
Infrastructure
Design
$4,000,000 CJ est. value
Commerce, GA 30530

Frankie Harris Park
Infrastructure
Bidding
$240,000 CJ est. value
Euharlee, GA 30120

Frankie Harris Park
Infrastructure
Bidding
$240,000 CJ est. value
Euharlee, GA 30120

Pavement Rehabilitation-Building H Parking Area and Raymond Kelley Drive
Infrastructure
Post-Bid
Milledgeville, GA

Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services - District 1
Infrastructure
Post-Bid
GA

T32-D1-PCC-I-85 NB Banks-108410
Results
GA

T32-D1-PCC I-85 SB Banks-108414
Results
GA

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

Murphy USA #7172/7850 / Baxley
New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Baxley, GA 31513

SR 253 From Decatur County Line to SR 91
Alteration
Design
$2,000,000 est. value
Elmodel, GA

Baxley - Emergency Storm Drainage Improvements - Bay Street
Infrastructure
Bidding
$400,000 CJ est. value
Baxley, GA 31513

Last Updated 09/23/2022 04:31 AM
Project Title

SR 76 / SR 333 From CS 735 / Crawford Street to SR 38 / US 84-tia

Physical Address View project details and contacts
City, State (County) Quitman, GA 31643   (Brooks County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This TIA Project includes sidewalk construction on SR 133 in the City of Quitman beginning at Shumate Street and ending at the Brook Forest Apartments. Total project length is 0.43 miles. County: Brooks As of September 23, 2022, the project is in Final Planning status. Anticipated letting Month is September, 2022. GADOT - SR 76 / SR 333 From CS 735 / Crawford Street to SR 38 / US 84-tia *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents