Similar Projects
West End Regional Pond & Trunk Oversizing - CIP - STORM-18-007 - City Of Shakopee
Infrastructure
Conception
$400,000 CJ est. value
Shakopee, MN 55379

CIP - Blue Lake Channel (East) Regional Storm Pond - Storm-21-002 - City of Shakopee
Infrastructure
Conception
$675,000 CJ est. value
Shakopee, MN 55379

Canterbury Independent Living
New Construction
Design
Shakopee, MN 55379

Canterbury Independent Living
New Construction
Design
Shakopee, MN 55379

Eagle Creek Parkway Improvement Project
Infrastructure
Bidding
$1,200,000 CJ est. value
Savage, MN 55378

Eagle Creek Parkway Improvement Project
Infrastructure
Bidding
$1,200,000 CJ est. value
Savage, MN 55378

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Construction Manager - Redevelopment of Sandventure
Infrastructure
Post-Bid
$5,000,000 est. value
Shakopee, MN

170th Street Improvement Project
Infrastructure
Results
Prior Lake, MN

170th Street Improvement Project
Infrastructure
Results
Prior Lake, MN

Arasan Apartments Phase II
New Construction
Pending Verification
Shakopee, MN

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

2024 Full-Depth Pavement Reconstruction - CIF-24-001 - City of Shakopee
Infrastructure
Conception
$1,525,000 CJ est. value
Shakopee, MN 55379

Innovation Center/Incubator - BA-20-005 - City of Shakopee
New Construction, Infrastructure - 36,000 SF
Design
$12,000,000 CJ est. value
Shakopee, MN 55379

Pumphouse 23
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Shakopee, MN 55379

Last Updated 03/14/2023 12:31 PM
Project Title

The Blakeley Apartments

Physical Address View project details and contacts
City, State (County) Shakopee, MN 55379   (Scott County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $77,326,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 14, 2023, this project is in design. An architect has been selected. Information on the general contractor has not been released. A firm construction timeline has not been established at this point in time.

Details

4 Stories Above Grade, New Construction, New Construction. Parking Spaces, 400 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents