Similar Projects
Drilling of Wells and Test Borings
Term Contract
Bidding
Great River, NY

Shore Road Waterfront Park Natural Systems Resiliency Improvements
Post-Bid
Lindenhurst, NY 11757

Septic System Replacement
Post-Bid
Fishers Island, NY

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Governor`s Office of Storm Recovery Mastic Beach Drainage Improvements CR12 General Construction
Results
$2,025,000 to $2,406,000 est. value
Farmingville, NY 11738

On-Call Sanitary Maintenance and Installation Contract
Infrastructure
Post-Bid
Brookhaven, NY

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Annual Requirements Contract - Cesspool Cleaning
Term Contract, Infrastructure
Post-Bid
NY

Drainage Improvements Albany Avenue Resurfacing
Infrastructure
Results
Lindenhurst, NY 11757

Corrugated Polyethylene Drainage Pipe
Infrastructure
Post-Bid
Brookhaven, NY

Eric Estates Water Main and Appurtenances
Infrastructure
Results
Greenlawn, NY

Annual Drainage Contract A, B and C
Term Contract
Post-Bid
East Hampton, NY

Construction Of a 20" x 10"- Diameter Well (No. 6)
Infrastructure
Results
Bellport, NY 11713

Cast Iron Drainage Items
Term Contract, Infrastructure
Post-Bid
Smithtown, NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Reported 01/19/2022 12:00 AM
Project Title

Contractor Services

Physical Address View project details and contacts
City, State (County) Greenport, NY   (Suffolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor duties include, but are not limited to trenching ,sewer and water maintenance and installation, electrical conduit and conductor and conductor installation pump and appendage repair and installation, grading and excavation, road repair, and assisting the utilities department with emergency repairs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents