Project Title | Jacksonville Harbor, Construction Dredging, 47-Foot Project Contract C, Cut-42, Blount Island Turning Basin and Local Sponsor Berthing Areas |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL 32207 (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $150,000,000 to $200,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Jacksonville Harbor, Construction Dredging, 47-Foot Project Contract C, Cut-42, Blount Island Turning Basin and Local Sponsor Berthing Areas: Deepening and strategic widening of the Federal navigation channel from the entrance of Bar Cut-3 through station 28+18.43 of Cut-45 to a project depth of 47 feet plus applicable overdepths and Advance Maintenance. The completion of the work will take place under multiple contracts. Contract C will dredge the Federal project from Station 33+80 Cut-42 to Station 136+00 Cut-42 and non-Federal berthing areas along Cut-42. Cut-42 will be dredged to a required depth of 48 feet plus 1 foot allowable overdepth. In addition, designated Advance Maintenance Areas incorporate an additional 2 feet of required dredging where applicable. All dredged material will be placed in the approved Ocean Dredged Material Disposal Site (ODMDS) which is located an average of approximately 16.7 nautical miles from the dredging location. Material to be dredged consists of unconsolidated materials and rock. The unconsolidated sediments are comprised of sand and silty sand with varying amounts of sand to gravel- sized shell, and soft to hard silt and clay. The rock is composed of siltstone, sandstone, and limestone varying from poorly indurated and weathered to hard. Blasting is prohibited under this contract. Work is divided into a base and two options. Base work includes Cut 42 STA 67+00 through STA 136+00, Option A work includes the Non-Federal Berths, and Option B work includes Cut 42 STA 33+80 to STA 67+00. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |