Similar Projects
25th Street Senior Housing
New Construction
Conception
Washington, DC

Union Market Gateway
New Construction - 52,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20002

Brookland Manor
New Construction
Design
Washington, DC 20018

Bearden Arts Building
New Construction - 26,000 SF
Design
Washington, DC 20002

Belmont Crossing Apartments - Phase I
Renovation - 231,370 SF
Sub-Bidding
Washington, DC 20032

Ridgecrest Apartments
Renovation - 124,600 SF
Sub-Bidding
$10,000,000 est. value
Washington, DC 20020

Terrace Manor Apartments
New Construction, Renovation
Post-Bid
Washington, DC 20020

Terrace Manor Apartments
New Construction, Renovation
Post-Bid
Washington, DC 20020

Redevelopment of Fletcher-Johnson
Results
Washington, DC 20019

Sursum Corda Turnkey and Sibley Townhomes Housing Community Developer
Results
Washington, DC 20002

3701 New Hampshire Avenue Northwest - Apartments
New Construction - 3,000 SF
Construction
Washington, DC 20010

Parkside - Parcel 11
New Construction
Construction
$42,400,000 est. value
Washington, DC 20019

1101-1107 H Street
New Construction - 6,300 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

1101-1107 H Street
New Construction - 6,300 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

Park Morton Phase III
New Construction
Conception
Washington, DC

Reported 06/04/2022 12:00 AM
Project Title

Park Morton Phase I - Midrise Building

Physical Address View project details and contacts
City, State (County) Washington, DC 20010   (District of Columbia County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Project Requirements: Davis Bacon DC Building Wage Scale DC Living Wage This project has a goal of 35% CBE compliance Section 3 - Hiring and business participation First Source - Percentage of hours worked

Details

Apartments/Condominiums, 5 Stories Above Grade, New Construction, 142 Unit(s), Parking Garage, 2 Stories Below Grade, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents