Similar Projects
Manning Avenue Revitalization Plan Project
Infrastructure
Conception
$6,832,000 CJ est. value
Sumter, SC 29154

Manning Avenue Revitalization Plan Project
Infrastructure
Conception
$6,832,000 CJ est. value
Sumter, SC 29154

Asphalt Repair and Concrete Addition
Post-Bid
$17,000 est. value
Sumter, SC 29153

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Carter Road Self-Storage
New Construction, Infrastructure - 43,048 SF
Pending Verification
$5,000,000 CJ est. value
Sumter, SC 29150

Carter Road Self-Storage
New Construction, Infrastructure - 43,048 SF
Pending Verification
$5,000,000 CJ est. value
Sumter, SC 29150

N. Main Street Revitalization Plan Project
Infrastructure
Conception
$6,832,000 CJ est. value
Sumter, SC 29154

State Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

US 15 Highway Funeral Home
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Sumter, SC 29150

RFP - Redeveloping Existing Property
New Construction, Infrastructure
Conception
$300,000 CJ est. value
Sumter, SC 29150

City Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Last Updated 10/20/2022 11:39 AM
Project Title

Birnie Hope Center Improvements 2022

Physical Address View project details and contacts
City, State (County) Sumter, SC 29150   (Sumter County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $547,548 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition and installation of asphalt parking lot and Trail, brick columns, signage, fencing, landscaping, irrigation and Electrical work, at the corner of Dingle and Purdy Drive at the existing Birnie Hope Center. Prior experience, qualifications and product certification will be required. This project will be funded by the City of Sumter. No bid may be withdrawn within a period of ninety (90) days to allow time for Bid review, qualification of Bidder, and approval of award from funding agencies All questions regarding this Project should be submitted to: Kimberly Brown, The LandPlan Group South, admin@landplansouth.com Bid related questions will be accepted through Thursday, September 1, 2022 @ 5:00 p.m. The answers to all questions asked will be shared with all participants in the Bid process. Each Bid must be accompanied by a certified check of the Bidder, or a Bid Bond duly executed by the Bidder as principal and having as surety thereon a surety company qualified to do business under the laws of the State of South Carolina and satisfactory to the Owner, in an amount not less than five (5) percent of the Bid. The Bidder to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond and Payment Bond, each in the sum of the full amount of the Contract Price, within ten (10) calendar days from the date when Notice of Award is delivered to the Bidder. The Owner reserves the right to reject any and all Bids when such rejection is in the interest of the Owner; to reject the Bid of a Bidder who has previously failed to perform properly or complete on time contracts of a similar nature; and to reject the Bid of a Bidder who is not, in the opinion of the Engineer, in a position to perform the Contract. The Owner also reserves the right to waive any informalities and technicalities in bidding. The Owner may also accept or reject any of the alternates that may be set forth on the Bid

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents