Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

241-301 Hanarry Drive (North) Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

FY 2018 Water Main Improvements Project
Results
Less than $2,000,000 est. value
Gainesville, GA

Replacement of Storm Piping
Post-Bid
Macon, GA 31200

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

New Dunbar Road Regional Stormwater Facility
Post-Bid
Byron, GA 31008

FY 2018 CDBG
Results
Less than $1,397,324 est. value
Cornelia, GA

Railroad Avenue - CDBG 2016 - Storm Sewer and Roadway Improvments
Post-Bid
Cochran, GA 31014

Concrete Pipe
Results
GA

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Lakeland Avenue Storm Pipe Repair
Results
Valdosta, GA

Reported 01/14/2020 12:00 AM
Project Title

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II

Physical Address View project details and contacts
City, State (County) Marietta, GA   (Cobb County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II: Stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repair will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water. Repair and maintenance of the existing storm pipe system will be facilitated through the installation of additional access manholes throughout the drainage system. The corrections of the existing system will be attained via pipe cleaning and lining as outlined in the specifications. In areas where pipe lining is not feasible the system will be repaired through replacement of the existing system. This project will also include the removal of trees on the south side of the runway to a distance established on the approved plans. This work will be completed in and around the State Water buffer and jurisdictional wetlands.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents