Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Engineering Services for Mechanical, Electrical, and Plumbing Continuing Contracts - All Regions
Term Contract
Bidding

CEI Areawide 14
Infrastructure
Bidding
$5,000,000 est. value

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Maintenance Personnel Support Services CSC
Infrastructure
Bidding
$5,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

The Brian D. Jellison Cancer Institute, Cancer Pavilion Phase 3 Architectural and Engineering Services
New Construction, Term Contract
Bidding
Sarasota, FL 34239

A-E Architectural Design Services at Various Installations
Post-Bid
Less than $99,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Environmental Monitoring Assessment & Consulting Services
Term Contract
Bidding

Last Updated 04/15/2022 01:17 PM
Project Title

Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B

Physical Address View project details and contacts
City, State (County) FL   (Brevard County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to the following: The Upgrades of the Environmental Control System (ECS) at LC 39B. The upgraded ECS will provide conditioned clean purge air to various compartments of the new Space Launch System (SLS) vehicle. The scope includes replacement of the existing cooling tower, relocation of existing ductwork, heaters, chambers, and instrumentation, addition of new heaters, chambers and high pressure ducts, replacement of filter housings and valves, revising existing gaseous nitrogen piping including replacement of heritage aluminum gaseous nitrogen piping with stainless steel, modification of existing controls systems hardware utilizing existing Allan Bradley PLC-based controls system architecture, installation of new humidifiers, and incidental related work. All equipment will be installed at and in the vicinity of KSC Building J7-337 (Launch Pad 39B). Existing piping and ducts will be replaced and/or relocated, requiring careful removal and demolition. Electrical equipment supporting the ECS will be modified to accommodate the new equipment. New ducts will be installed to interface with the Mobile Launcher. Replacement of the existing cooling tower, demolition of the existing cooling tower, construction of a support frame, procurement of a packaged cooling tower including fill, fans, gear boxes, pumps, valves, piping, access platform, and handrails. Control System work will require fabrication of system cables that include signal-level I/O and AC and DC distribution and control, and will utilize heavy-duty cables and MIL-SPEC connectors required to meet various KSC and MIL standards. This facility will be undergoing other construction modifications during the performance of this construction project and close coordination with the Government’s team will be required. Specifically, this project consists of, but is not limited to: A. Upgrade of the LC 39B Environmental Control System. 1. Replacement of existing cooling tower including replacement of all components. 2. Fabrication and installation of high pressure (~ 10 psig) air-tight flanged single wall and dual wall ductwork with insulation. 3. 60Hz power modifications to switchgear and motor control centers. 4. Fabrication of custom heavy duty connector type control cabling and installation between instrumentation / control devices and remote IO and/or power distribution cabinets. 5. Fabrication and installation of ~150 psig stainless steel gaseous nitrogen piping. 6. Fabrication and installation of structural steel service platforms. B. Contractor will be required to closely coordinate all sub-contractor’s trades and create and maintain a 3-D coordination model to aid in production of shop drawings, placement of equipment and execution of work with the existing and new work. C. Contractor will be required to provide testing results of each system (cooling tower performance, ductwork leak and proof tests, maximum system performance requirement test, and operations validation) and provide full support to operate the system for the Government’s witnessed Commissioning including testing.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents