Similar Projects
Central HS Combes Gym
Renovation
Bidding
Champaign, IL 61820

2021 General Remodeling at Lockport Township High School
Renovation
Bidding
Lockport, IL 60441

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II & Field House Expansion
Renovation, Addition - 119,000 SF
Results
Lincolnshire, IL 60069

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Robinson Health-Life Safety Improvements
Renovation
Bidding
Robinson, IL 62454

2021 Summer Work
Renovation, Addition
Post-Bid
Winnetka, IL 60093

Disaster Recovery Services
Results

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Bidding
Less than $4,200,000 est. value
Argenta, IL 62501

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Joseph Sears School Summer Bid Package 1
Renovation
Bidding
Kenilworth, IL 60043

2021 Capital Improvements
Post-Bid
Carol Stream, IL 60188

Accessibility and Miscellaneous Work at Mille Proegler School
Results
Kankakee, IL 60901

Last Updated 03/25/2021 10:02 AM
Project Title

Transition Building Build Out

Physical Address View project details and contacts
City, State (County) Downers Grove, IL 60515   (DuPage County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BID PACKAGES #1, #2, #3, #4, #5, #6, #7, #8. #9 and #10: Bid Package #1 - Masonry Bid Package #2 - General Trades Bid Package #3 - Drywall and Framing Bid Package #4 - Painting Bid Package #5 - Flooring Bid Package #6 - Plumbing Bid Package #7 - Fire Suppression Bid Package #8 - HVAC Bid Package #9 - Electrical Bid Package #10 - Low Voltage and AV

Details

Middle/Senior High School, Build-Out.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents