Similar Projects
Groundwater Well Rehabilitation - CIPWA61048 - City of Glendale
Infrastructure
Conception
$8,790,000 est. value
Glendale, AZ 85301

Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Bidding
$18,197,000 est. value
Gilbert, AZ 85297

Trillium Water Campus and Potable Wells
Infrastructure
Bidding
$500,000 est. value
Phoenix, AZ

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Materials and Equipment for Well 21 Repair
Term Contract
Post-Bid
Luke Air Force Base, Peoria, AZ 85309

Water/Wastewater Pumps
Results
Mesa, AZ 85203

Pump Maintenance, Repair and Purchase - As Needed (Western Region State Parks)
Results
Phoenix, AZ 85085

Drilling and Installation of the Ross Dress For Less Replacement Well
Infrastructure
Bidding
$1,500,000 est. value
Buckeye, AZ

Construction Project Drilling and Installation of the Pulte Rio Caballo Well No.1
Infrastructure
Post-Bid
Surprise, AZ 85387

Irrigation Pump Maintenance
Term Contract
Results
$25,000 est. value
Scottsdale, AZ

HVAC Parts, Repair Services and Pump Rebuilds
Alteration
Post-Bid
Glendale, AZ

Pump Maintenance, Repair and Purchase - As Needed (Northern Region State Parks)
Term Contract
Results
Phoenix, AZ

Tartesso Unit 3A Well No. 4 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

SPA 1 Recharge Expansion CMAR
Results
Surprise, AZ 85379

Trillium Phase 1 Well #3 Drilling Project
Alteration
Post-Bid
Buckeye, AZ

Reported 06/24/2022 03:14 PM
Project Title

Signal Butte Water Treatment Plant Equipment Replacement - CP0643 - City of Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85201   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $6,215,354
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct plant improvements and equipment replacement that will provide increased reliability and cost effective operation of the SBWTP. This includes rehab or replacement of bulk chemical tanks, pump and piping, sludge pumps and valves, etc. As of June 23, 2022, this project is included in the City of Mesa FY 2023-2027 CIP. The design completion and firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents