Similar Projects
Last Updated | 09/15/2022 01:36 AM |
Project Title | New Storage Building for Milford Lake |
Physical Address | View project details and contacts |
City, State (County) | Junction City, KS 66441 (Geary County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Site Development, Warehouse/Storage |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This w ork w ill include installation of a single 45' x 64' w ooden pole barn, w ith the installation of concrete, utilities, and chain-link fence. The Contractor shall provide all equipment, labor, supervision, and material necessary to complete the project. This is a w oman ow ned small business set-aside. The NAICS Code is 236210 Industrial Building Construction POINTS OF CONTACT Title Name Phone Email Contracting Officer Joshua Higginbotham (816) 389-3059 Joshua.m.higginbotham@usace.army.mil Project Manager Kenneth Wenger (816) 389-3754 ken.r.wenger@usace.army.mil BID INFORMATION BEFORE SIGNING AND EMAILING YOUR BID, please take note of the following, as failure to perform any one of these actions may cause your bid to be rejected. 1. AMENDMENTS: Have you acknowledged receipt of ALL Amendments If in doubt as to the number of amendments issued, please contact our office. 2. SEALED BIDS: Sealed envelopes containing bids shall be marked to show the bidder's name and address, the solicitation number, amendments received, and the date and time bids are due. 3. AMENDED BID PAGES: If any of the Amendments furnished amended bid pages, the amended bid pages must be used in submitting your bid. 4. BID GUARANTEE: Sufficient bid guarantee in proper form must be furnished with your bid, if your bid exceeds $150,000. 5. MISTAKE IN BID: Have you reviewed your bid prices for possible errors in calculations or work left out 6. FACSIMILE BIDS AND MODIFICATIONS: Will not be considered. Facsimile withdrawals will be considered. 7. BUY AMERICAN ACT: All bidders are cautioned that, prior Government conduct notwithstanding, the Contractor's selection of a domestic construction material which would require the subsequent selection of a foreign construction material for compatibility is not a justification for waiver of the Buy American Act. It is the Contractor's responsibility to verify, prior to submitting the materials for approval, which each system can be built to meet the contract specifications without the use of foreign construction materials. 8. SYSTEM FOR AWARD MANAGEMENT (SAM): In accordance with FAR 52.204-7: By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to submitting an offer, before award and during performance and through final payment of any contract resulting from this solicitation. If the Offeror is not registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://sam.gov/portal/SAM/#1 . It is highly encouraged that all prospective Offeror's start the SAM's registration process as soon as possible *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |