Similar Projects
Chandler Elementary School Renovations - 2021 Bond - Kilgore Independent School District
New Construction, Renovation, Infrastructure
Design
$4,000,000 CJ est. value
Kilgore, TX 75662

PRESS - Ford Lane Commercial Building - Trademark Construction
New Construction, Infrastructure
Design
$650,000 CJ est. value
Longview, TX 75602

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

US 80 - Resurface Roadway
Infrastructure
Bidding
$3,477,503 CJ est. value
Longview, TX 75604

2021 HMAC Hot In-Place Recycling
Infrastructure
Post-Bid
Longview, TX

2022 Chip Seal
Infrastructure
Post-Bid
$1,200,000 est. value
Longview, TX

High Street and Mobberly Avenue Intersection Improvements
Infrastructure
Results
$2,850,000 est. value
Longview, TX 75602

Street Improvements, Phase 2
Infrastructure
Results
$85,000 to $95,000 est. value
Lakeport, TX 75603

Longview Christian Church Addition and Remodel
Addition, Demolition, Renovation, Infrastructure - 12,000 SF
Construction
$1,500,000 CJ est. value
Longview, TX 75605

Scooters Coffee #1436 / Longview
New Construction, Infrastructure - 664 SF
Construction
$350,000 CJ est. value
Longview, TX 75604

Southern Tire Mart / Longview
New Construction, Infrastructure - 48,130 SF
Pending Verification
$8,500,000 CJ est. value
Longview, TX 75604

New Pro Star Rental Building
New Construction, Infrastructure - 11,422 SF
Pending Verification
$1,500,000 CJ est. value
Longview, TX 75604

Residences at Toler - Longview
New Construction, Infrastructure - 4,650 SF
Design
$10,000,000 CJ est. value
Longview, TX 75605

30-In Waterline Repair At Grace Creek
Infrastructure
Post-Bid
$350,000 CJ est. value
Longview, TX 75604

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Last Updated 02/24/2023 01:13 PM
Project Title

US 80 - Resurface Roadway

Physical Address View project details and contacts
City, State (County) Longview, TX 75604   (Gregg County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $12,569,411 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Ps&e Package Questions Call: Bryan Lutz, P.E. 2709 West Front Street Tyler, Tx 75702 903/510-9285 Length: 0 Mi Time for Completion: 135 Working Days For Questions Regarding a Proposal Call 512/416-2498 ------------------------------------------------------------------------------ County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Gregg 0096-06-075 Fm 1845 Us 80 F 2023(461) Sh 300 Length: Miles Gregg 0096-04-069 Lockerplant Rd, 1.1 Mi E of Sl 485 Us 80 Br 2023(451) East Lake Devernia Rd. Length: 0 Miles Gregg 0096-04-072 Fm 3272 Us 80 F 2023(461) Fm 1845 Length: Miles TXDOT - US 80 - Resurface Roadway During final clean up, remove all foreign material that has accumulated at bridge abutments and bent caps as approved. All work and equipment involved in the removal of this material is subsidiary to the bid items of the Contract. All stockpiles within TxDOT right of way, must not exceed 12 ft. in height and must have 3:1 slopes unless otherwise directed. Place stockpiles in a manner that will be outside the horizontal clear zone, will not obstruct traffic or sight distance, and will not interfere with roadway drainage. Remove all vegetation from pavement edges, intersections, and driveways prior to planing operations, seal coat, or ACP operations. This work will not be paid for directly, but will be subsidiary to the bid items of the Contract. Contractor questions on this project are to be addressed to the following individuals: Kyle Dykes, P.E. kyle.dykes@txdot.gov Stacey Wylie, P.E. stacy.wylie1@txdot.gov Contractor questions will be accepted through email, phone, and in person by the above individuals. All Contractor questions will be reviewed by the Engineer. Once a response is developed, it will be posted to TxDOT's Public FTP.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents