Similar Projects
Last Updated | 11/05/2020 10:32 AM |
Project Title | Lisboa Diversion Dam Replacement |
Physical Address | View project details and contacts |
City, State (County) | Pecos, NM (San Miguel County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Department of Game and Fish would like to establish a construction contract to consist of removal of an existing concrete dam structure and disposal off - site, construct and maintain a temporary water diversion dam & channel to bypass river flows around the work area, construction of a new dam weir structure including large boulders, concrete grout, rock riprap, rock filter material, and related materials, construction of a downstream rock weir, excavation and fill within the river channel, removal of the temporary water diversion dam, restoration of all disturbed areas, and other project related features. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |