Similar Projects
Roadway Minor Rehab - SR 46
Infrastructure
Design
$838,000 CJ est. value
Niles, OH 44446

Roadway Minor Rehab - US 62
Infrastructure
Design
$2,050,000 CJ est. value
Cortland, OH 44410

Intersection - US 62
Infrastructure
Bidding
$2,420,000 CJ est. value
Cortland, OH 44410

Sanitary Detention Pump Stations Rehabilitation
Renovation
Bidding
$472,900 CJ est. value
Niles, OH 44446

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

RFQ D/B - YARS Assault Strip Widening - Youngstown ARS
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Vienna, OH 44473

Water Distribution Repairs and Site Improvements - CM at Risk
Infrastructure
Results
$8,000,000 est. value
Leavittsburg, OH 44430

S.R. 45 Corridor Improvements Final Site Work - Water Booster Pump Station
Renovation
Results
$536,700 est. value
Lordstown, OH 44481

Slope Stabilization
Infrastructure
Construction
$26,000 CJ est. value
Masury, OH 44438

Mosquito Lake State Park Marina Fuel System Trumbull
Infrastructure
Construction
$392,125 CJ est. value
Cortland, OH 44410

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

Mercy Health Medical Campus / Warren
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Warren, OH 44483

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Main Street (S.R. 46/ S.R. 169) for Reconstruction of Existing Traffic Signals
Infrastructure
Post-Bid
$480,000 CJ est. value
Niles, OH 44446

Concrete Driveway and Parking Lot Improvements (Fire Stations #8 and #7)
Infrastructure
Results
$144,378 CJ est. value
Niles, OH 44446

Last Updated 01/03/2023 05:33 PM
Project Title

Trumbull Correctional lnstitute Lift Station Ohio Department of Rehabilitation and Correction

Physical Address View project details and contacts
City, State (County) Leavittsburg, OH 44430   (Trumbull County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $496,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

EDGE Participation Goal: 5.0 percent of contract. DOMESTIC STEEL Use as Required Per Code Section 153.011 CONTRACT ESTIMATED COST General Contract $ 552,000 Alternate 1 $ 40,000

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents