Similar Projects
Intersect Modif - SH 412B
Infrastructure
Conception
$4,120,000 CJ est. value
Chouteau, OK 74337

Intersect Modif - SH 412B
Infrastructure
Conception
$4,120,000 CJ est. value
Chouteau, OK 74337

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain and Surface - US 69
Infrastructure
Design
$17,315,900 CJ est. value
Pryor, OK 74361

Pavement Rehabilitation (Asphalt) Will Rogers Turnpike
Infrastructure
Bidding
$4,500,000 CJ est. value
Pryor, OK 74361

Pavement Rehabilitation (Asphalt) Will Rogers Turnpike
Infrastructure
Bidding
$4,500,000 CJ est. value
Pryor, OK 74361

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

8-inch Waterline project
Infrastructure
Results
$470,100 est. value
Adair, OK

Slabjacking and Subsealing Services
Infrastructure
Results

Pavement Rehabilitation - US 69
Infrastructure
Design
$16,553,256 CJ est. value
Pryor, OK 74361

Snowdale Park - Courtesy Dock Construction and Install
Infrastructure
Bidding
$100,000 CJ est. value
Pryor, OK 74361

Locust Grove Public School Road Project
Infrastructure
Post-Bid
Locust Grove, OK 74352

Right of Way Clearance - Sh-28
Infrastructure
Results
OK

Pavement Rehabilitation - SH 412
Infrastructure
Design
$9,900,082 CJ est. value
Locust Grove, OK 74352

Last Updated 01/17/2023 04:09 PM
Project Title

Williams Street Grading, Drainage and Surfacing - Phase 2

Physical Address View project details and contacts
City, State (County) Pryor, OK 74361   (Mayes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,480,367 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Williams Street between 50th Street and Hunt Street / SH-412B Williams Street will be improved between 50th Street and Hunt Street/ SH-412B. The new roadway will be four (4) lanes with surfaced shoulders and open ditches. The work includes grading and surfacing at the approaches to two (2) at-grade railroad crossings. One crossing is located approximately 1.15 miles west of 50th Street and the other crossing is immediately east of the intersection of Williams Street and 50th Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents