Similar Projects
Draft: Bardwell Lake Park Cleaning Services
Term Contract
Design
$500,000 to $1,000,000 est. value

Unrestricted Vertical MATOC
Term Contract
Design
Fort Worth, TX

IH 35W - Winter Weather Material
Term Contract
Sub-Bidding
$953,520 CJ est. value
Fort Worth, TX 76102

Annual Requirements Contract for Grass Sod
Term Contract
Sub-Bidding
Arlington, TX 76010

Ground-Based Mosquito Control and Surveillance Activities
Post-Bid
TX

Pest Control Services
Post-Bid
Mansfield, TX

Grease Trap Services
Results

Reverse Osmosis and De-Ionized Water
Term Contract
Results
Arlington, TX

Furnish and Deliver Pipeline Chemicals
Term Contract
Sub-Bidding
Fort Worth, TX 76102

Pest Management Services
Term Contract
Post-Bid
Azle, TX

Weekly Pool Cleaning Services
Term Contract
Results
Arlington, TX 76013

1800 Feet of 16-inch PVC C-900 DR18 Blue Pipe, 20 Foot Joints
Term Contract
Sub-Bidding
Mansfield, TX 76063

Exterminating/Pest Control and Bee Removal Services
Term Contract
Post-Bid
TX

FY 22 Pest Control East and West Facilities
Alteration
Results
TX

Athletic Supplies, Equipment and Services - Supplemental
Term Contract
Sub-Bidding
$800,000 CJ est. value
Haltom City, TX 76117

Last Updated 07/29/2022 04:07 PM
Project Title

Cleaning Services for the Keller ISD Stadium

Physical Address View project details and contacts
City, State (County) Keller, TX 76248   (Tarrant County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Service/Term Contracts, Stadium
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The length of this contract shall be one year from the date of award renewable annually for four additional one year periods at the District's discretion. Although we are legally required to accept paper bids, we strongly request that bidders submit this bid electronically. Please call if you require any assistance with this submittal. EMAILED AND/OR FAXED SUBMISSIONS WILL NOT BE ACCEPTED. Question Cutoff Date: 7/22/2022 03:00 PM (ET)

Details

Division 01 - General Requirements, Cleaning and Waste Management.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents