Similar Projects
Reported | 08/25/2020 12:00 AM |
Project Title | USACE Buffalo District Buildings Renovations |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14207 (Erie County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | GOVERNMENT REQUIREMENTS: USACE Buffalo District is seeking interested firms capable of providing engineering services to design renovations to two (2) buildings at the USACE Buffalo District reservation property at 1776 Niagara Street, Buffalo, New York 14207. A follow on procurement may be pursued to provide consultative services during the renovations. The start of the work is still in the planning stages and may commence in the spring of 2020. General description of work is as follows: - Design renovations to Building B5 Warehouse of approximately 10,000 SF of ?oor area. Provide open o?ce space within the warehouse of approximately 2,000 SF to accommodate 10 employees. Provide geotechnical workshop space, restroom, and showering facilities. Completely demo existing interior facility to structural shell and remedy current code compliance issues. The estimate demo scopes includes demolition to structure of the interior of Building 5. Only the exterior shell, slab, and roof are to remain. All openings in the vertical shells are to be removed and replaced as well as brick veneer facade sections. Some pavement repair will be required at the perimeter of Building B5 including where it is recommended that overhead doors be replaced and new utility lines placed. The cost estimate re?ects costs associated with these repairs. - Design renovations of Building B4 includes tuckpoint, repair and wash of all masonry veneer and roo?ng system repair, complete with parapet rework, ?ashing, and drainage. Doors are included to be replaced. Interior ?nishes are also included such as wall and ceiling painting, and concrete ?oor ?nishing. All electrical equipment from point of service within the building is replaced with newer equipment in order to support the end state of the project. This includes 300KVA transformer, 6-second switch gear, and 800A ATS such that all equipment in the electrical distribution line servicing Building B5 will be replaced. It is assumed other equipment can remain in place to service other buildings intended to be demolished. Additionally, the three (3) interior rooms will receive new lighting, convenience receptacles, FA/MNS components and freeze protection heating devices. A small allowance for landscaping and re-placement of the elevated slab for unloading equipment is also included. |
||||||||||||||||||||||||||||||||||||||
Details | 2 Warehouse/Storage, Approximately 10,000 SF Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |