Similar Projects
Sage Park Middle School Roof Replacement
Bidding
Windsor, CT 06095

General and Specialty Repair Services
Term Contract
Post-Bid
Newington, CT 06111

Roofing Envelope Services
Post-Bid

Partial Roof Replacement at Southington High School
Results
Southington, CT 06489

Pitkin School Roof Replacement
Results
$344,000 est. value
East Hartford, CT 06118

Reroofing and Related Work Myrtle H. Stevens School
Post-Bid
Rocky Hill, CT 06067

Roof Replacement and Repair, Carl Robinson Correctional Facility
Results
$937,970 to $1,036,702 est. value
Enfield, CT 06082

Roofing Repairs/Replacement Union Station Transportation Center
Post-Bid
Hartford, CT 06103

Clover Street Elementary School Partial Roof Replacement Project
Results
Windsor, CT

Hartford Facility Roof Patch
Post-Bid
Hartford, CT 06120

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Regional Market - Roof Framing Structural Repairs, Buildings A and B
Post-Bid
$50,000 to $70,000 est. value
Hartford, CT 06114

NB Fire Stations Roof Replacement and Masonry Repair
Results
$100,000 est. value
New Britain, CT 06051

Housing Rehabilitation Program Property of Mary Van Den Broek
Renovation
Post-Bid
Hazardville, CT 06082

Roofing Inspection, Preventive Maintenance and Repair Services
Results
Enfield, CT

Last Updated 12/23/2019 03:42 PM
Project Title

Roof Replacement at Fernridge Park Pool House

Physical Address View project details and contacts
City, State (County) West Hartford, CT   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and install a new roof at the Fern Ridge Park Pool House. This project will be located at 567 Fern Street, West Hartford. It will involve the removal of the existing roof and installation of new roof. 1. Remover existing roof shingles, flashings, rake edges and drip edges down to deck. Inspect wood Deck. 2. Install new 30 year Sarnafil Décor Roof System (Color to be determined by Town of West Hartford). 3. Vinyl profiles to be spaced approximately 2 feet on center. 4. Install 4 inch cement roof board over existing deck. 5. Install vapor barrier 6. Install ““F5” Drip edge 7. Install “C4” Rake edge 8. Install pipe boots flashings (vent pipe) 9. Install Chimney flashing with 12 in. of lead 10. Install vaperbarrier on entire roof. 11. Town will pay all fees associated with the building permit process. 12. Not included: testing and/or removal of hazardous materials.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents