Similar Projects
East Street Gravity Sewer
Infrastructure
Bidding
Raleigh, NC 27601

Grease Trap Pumping Service
Term Contract
Bidding
NC

Water Meter Boxes and Lids
Term Contract
Post-Bid
Raleigh, NC 27602

Neuse River East Parallel Interceptor
Post-Bid
$75,000,000 to $85,000,000 est. value
Raleigh, NC

West Neuse Interceptor, Upper Walnut Creek Interceptor and Neuse River East Parallel Interceptor
Results
Raleigh, NC

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

North Carolina DHHS Campus Phase 1 Motor Fleet Management Utilities Relocation
Infrastructure
Construction
Raleigh, NC

North Carolina DHHS Campus Phase 1 Motor Fleet Management Utilities Relocation
Infrastructure
Construction
Raleigh, NC

West Neuse Interceptor Improvements (Formal)
Infrastructure
Bidding
Raleigh, NC

Jordan Lake Water Reclamation and Reuse Project Phase 2
Post-Bid
Raleigh, NC

Crabtree Creek and West Neuse Interceptor Rehabilitation
Results
Less than $12,000,000 est. value
Raleigh, NC 27601

2022 Water Main Replacement Project
Infrastructure
Bidding
$3,000,000 to $5,000,000 est. value
Cary, NC

2021 Water Main Replacement Project
Post-Bid
Cary, NC

Harris Creek Sanitary Sewer Replacement
Results
Raleigh, NC

Hollybrook Pump Station and Force Main
New Construction - 1,157,835 SF
Post-Bid
Wendell, NC 27591

Last Updated 03/24/2022 03:35 PM
Project Title

Design Build Services for Friendship Public Utilities

Physical Address View project details and contacts
City, State (County) Holly Springs, NC   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes extension of water, reclaimed, forcemain and pump station construction. The project is generally located in Holly Springs along Friendship Road, Holly Springs-New Hill Rd, Green Oaks Parkway, and the Town’s water reclamation facility. The selected design firm will utilize the Friendship plans (dated 2010), herein known as WR Plans, as 30% construction drawings. These plans are split into 2 separate phases and the selected DB should combine the two project phases into one project. The selected DB shall confirm and or revise all areas of the project for existing field conditions and develop a new set of design build plans to be used for construction. Numerous developments/utility installations have occurred along the project alignment since 2010.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents