Similar Projects
Metro Parkway Resurfacing - Mound Road to Ryan Road - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Dobry Drive Resurfacing - Ryan Road East To Crossover
Alteration
Conception
$1,000,000 est. value
Sterling Heights, MI 48310

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Post-Bid
$420,000 CJ est. value
Warren, MI 48093

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bundle 3 Rest Area Ada Eastern Lower Peninsula - Interior
Results

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

Circle A
Demolition, New Construction, Infrastructure, Renovation - 3,612 SF
Pending Verification
$1,500,000 CJ est. value
Sterling Heights, MI 48310

15 Mile Road Resurfacing - Van Dyke Avenue to Maple Lane - City of Sterling Heights
Infrastructure
Conception
$1,200,000 est. value
Sterling Heights, MI 48310

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

2022 High School Paving Work
Infrastructure
Post-Bid
Richmond, MI 48062

Transportation Building Site Renovations Project
Infrastructure
Results
Warren, MI 48089

Jefferson Avenue Office
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
St Clr Shores, MI 48080

Last Updated 04/21/2023 12:06 AM
Project Title

Schoenherr Road Pavement Surface Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI 48313   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,461,174 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Surface Approximately 0.92 Miles. Cold milling of existing pavement, Concrete pavement removal/replacement, curb and gutter Removal/replacement , Installation of sidewalk and ADA Ramp ,Joint and Crack Repair , Pavement marking , 3" HMA Overlay, including and adjustments of all necessary storm and utility manholes in Sterling Heights, Macomb County. Sawing and Sealing Pavement Joints (NB Schoenherr Rd. - 1000' N. Clinton River to 500' S. Canal) A satisfactory Bid Bond, Certified or Cashier's Check, Bank Money Order, or Certificate of Deposit on an open, solvent bank in the amount of not less than 5% of the total bid and made payable to the Macomb Department of Roads shall be submitted with each bid. The MCDR at its discretion reserves the right to reject any or all bids and to waive any irregularities in the bidding process and to make the award as may appear to be in the best interest of the County of Macomb. Questions Deadline: 3/24/23 at 2:00 PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents