Similar Projects
Full Depth Reclamation, AC Resurfacing; Crack & Seat, AC Surfacing, Curb and Gutter, Guardrail
Infrastructure
Conception
$10,335,000 CJ est. value
Rapid City, SD 57702

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$6,946,000 CJ est. value
Union Center, SD 57787

DBB Explosive Ordinance Disposal Facility, Ellsworth Air Force Base (AFB)
New Construction, Infrastructure - 4,931 SF
Design
$5,000,000 CJ est. value
Ellsworth AFB, SD 57706

Structure and Approach Grading
Infrastructure
Design
$462,000 CJ est. value
North Meade, SD 57758

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Building 46 Dock Paving
Infrastructure
Post-Bid
$25,000 CJ est. value
Fort Meade, SD 57741

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Pipe Work
Infrastructure
Results
$5,245,853 CJ est. value
Faith, SD 57626

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Pipe Work
Infrastructure
Results
$5,245,853 CJ est. value
Faith, SD 57626

Lakeside Adventure Park / Sturgis
New Construction, Infrastructure
Pending Verification
$5,900,000 CJ est. value
Sturgis, SD 57785

Sturgis Brown High School Kitchen Expansion - Meade School District
Addition, Renovation, Infrastructure
Pending Verification
$4,700,000 CJ est. value
Sturgis, SD 57785

Replace Str Bridge, Approach Grading
Demolition, New Construction, Infrastructure
Conception
$2,717,000 CJ est. value
Union Center, SD 57787

$PRESS - I-90 Reconstruction - Complete Concrete, Inc
Infrastructure
Design
$35,000,000 CJ est. value
Sturgis, SD 57785

EHRM Infrastructure Upgrade Construction Fort Meade VAMC
Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Fort Meade, SD 57741

Madison Well #2 Project, Schedule 3: Well Construction
Renovation, Infrastructure
Results
$1,248,403 CJ est. value
Sturgis, SD 57785

Alkalai Road, Backup Deep Well, Greslin GSR & Booster Station
Infrastructure
Conception
$6,317,500 CJ est. value
Sturgis, SD 57785

Last Updated 06/27/2023 04:08 PM
Project Title

New Elevated Water Storage Tower - City of Faith

Physical Address View project details and contacts
City, State (County) Faith, SD 57626   (Meade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,332,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of September 29, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Bidding is estimated to take place in early 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents