Similar Projects
Aptitude Parkside
New Construction, Demolition
Design
Birmingham, AL 35233

1300 Fifth Avenue South
New Construction, Demolition
Design
Birmingham, AL 35206

Parking Deck Concrete Repair Project
Post-Bid
Huntsville, AL 35806

Bridge Street Town Center
Renovation
Post-Bid
Huntsville, AL 35806

2020 Annual Parking Deck Repairs - Signage Phase
Results
Less than $150,000 est. value
Tuscaloosa, AL

Holmes Avenue Parking Garage Retail Space
Results
Huntsville, AL 35801

Marriott Tribute Hotel - Alamite
New Construction - 110,966 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Tuscaloosa, AL 35404

A New Parking Deck at Folsom Administrative Building
New Construction
Construction
Montgomery, AL 36130

Ascent Garage
New Construction
Design
Birmingham, AL 35206

Wright Street Parking Deck
Post-Bid
Auburn, AL 36830

Monroe Street Parking Garage
Results
Less than $13,899,969 est. value
Huntsville, AL 35801

Cruise Terminal Parking Deck Structural Repairs
Post-Bid
Mobile, AL 36602

UAB Campus Wide Parking Deck Repairs and Maintenance
Term Contract
Results
Less than $527,194 est. value
Birmingham, AL 35294

Ariza
New Construction - 3,413,229 SF
Post-Bid
$10,000,000 CJ est. value
Huntsville, AL

FMTC Range Control POV Parking Maintenance and Repair
Results
Less than $180,000 est. value
Anniston, AL 36205

Last Updated 12/19/2019 11:55 AM
Project Title

Holmes Avenue Parking Deck

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35801   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a new six (6) level building which includes approximately 6,900 SF of retail space at the ground level with 5 levels of parking above. Each level is approximately 36,027 SF (the top level is approximately 21,040 SF) post-tension cast-in-place concrete. The number of parking spaces total approximately 480.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents