Similar Projects
YMCA Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sylvania, OH 43560

Universal Metals Expansion
Addition, Infrastructure - 75,000 SF
Conception
$40,300,000 CJ est. value
Toledo, OH 43611

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

West Central Avenue Apartments
New Construction, Infrastructure - 124,900 SF
Design
$34,000,000 CJ est. value
Toledo, OH 43606

Cherry/Summit Roadway Reconstruction
Infrastructure
Bidding
$400,000 CJ est. value
Toledo, OH 43604

Cherry/Summit Roadway Reconstruction
Infrastructure
Bidding
$400,000 CJ est. value
Toledo, OH 43604

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Maumee Bay Boardwalk Improvements - Ohio Department of Natural Resources
Infrastructure
Post-Bid
$5,700,000 CJ est. value
Oregon, OH 43616

Glendale Terrace Site Improvements
Infrastructure
Results
Toledo, OH

Transportation Site Improvement Project
Infrastructure
Results
$1,127,000 est. value
Toledo, OH

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Vitalia Senior Living Sylvania
New Construction, Infrastructure
Conception
$60,600,000 CJ est. value
Sylvania Township, OH 43617

Irwin Road Chip Seal Work
Infrastructure
Design
$50,000 CJ est. value
Toledo, OH 43620

Last Updated 01/30/2023 11:34 PM
Project Title

Hoffman Road Landfill - Section 4, Phase 1 Cell Construction

Physical Address View project details and contacts
City, State (County) Toledo, OH 43611   (Lucas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $99,961 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Section 4, Phase 1 disposal cell at the Hoffman Road Landfill. Includes mass excavation, soil liner construction, geosynthetics procurement/deployment, leachate management system and ancillary, related infrastructure. Project Type Bid Response Types Line Items Bid Bond Project Paperwork (required) Signed Contract (required) Child Support Affidavit (required) Certificate of Insurance (required) Bureau Workers Compensation Cert (required) Tax Exemption Cert (required) Preliminary Project Schedule (required) Additional Upload Area, if needed Additional Upload Area, if needed Type of Award Lump Sum Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Local - Local Business Bid Valid 60 Days Liquidated Damages $950 / Day Start/Delivery Date Upon issued PO Project Duration 8-10 Months Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 12/07/2022 5:00 PM (EST) Questions must be submitted thru electronically. In order to be responsive, all bids must have the following with submittal: Construction Project Paperwork* Line Items Bid Guaranty (bid bond or certified check / cashier's check on a solvent bank) Signed Contract by the Vendor* Child Support Affidavit* Bureau of Worker's Compensation Certificate Tax Exemption Certificate* Insurance Certificate, naming the City of Toledo as an additional insured Project Specific Submissions: Preliminary Project Schedule Unit Rates for Labor & Equipment References for Similar Projects (3 total) Expected Project Personnel (Project Manager, Superintendent, Contract Manager) Major Subcontractors & Suppliers This is a prevailing wage project. The design of this project was completed by the owner's in-house design professional. The Work to be performed under this Contract includes the construction of the 5.3-acre Section 4 Phase 1 Cell. Contractor activities include: stripping, containment berm construction, access road improvements, material excavation and hauling, RSL placement and compaction, providing and installing the leachate drainage layer, installing general fill, access roads and surface water control berms and culverts, and seeding/mulching disturbed areas. Site preparation activities include: -Stripping and clearing materials, and removing designated items from within the proposed limits of construction and designated soil stockpile area; -Construction of a perimeter containment berm for stockpiling of excavated materials; - Mass excavation lacustrine soils overlying glacial till soils for placement in the soil stockpile area; - Access Road construction from the existing Hoffman Road to: o Section 4, Phase 1 Cell; and, o Section 3 disposal area, including stripping, drainage culverts, and placement of General Fill for the protection of existing interim cover. The 5.3-acre composite liner system consists of the following from the bottom to top: - 3-foot thick Recompacted Soil Layer; - 60mil HDPE Geomembrane; - 1-foot thick Leachate Drainage Layer; - Non-Woven Geotextile Fabric; - General Fill for Termination Berms and Access Road improvements; and, - Temporary stormwater diversion berms and drainage culverts. All Work must be carried out and maintained in accordance with the Construction Drawings and Technical Specifications. Materials found to be outside the tolerances identified in the Construction Drawings and Technical Specifications must be reworked or removed and replaced to the approval of the CQA Consultant and at no additional cost to the Owner. Contractor will be responsible for any damage their operations cause to any portion of the Work or existing structures, regardless of the circumstances, and will repair this damage to the approval of the CQA Consultant and at no additional cost to the Owner. Contractor will be responsible for all dewatering and repairs required due to rain or freezing; associated costs are to be included in unit prices. The Contractor will also be responsible for dust control and maintaining all required haul roads during construction.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents