Similar Projects
Last Updated | 02/15/2022 07:47 AM |
Project Title | Right of Way Tree Trimming and Vegetation Removal |
Physical Address | View project details and contacts |
City, State (County) | Newberry, FL (Alachua County) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Qualified firms for vegetation removal from the entire Electric Distribution System as defined in Attachment A. Proof of OSHA 1910.269 to take place over a 36 month period, commencing in October 2021 and ending September 2024. Compliance of any employees to perform trimming. The winning bidder must have at minimum a 55’ to 60’ aerial bucket truck, chipper and associated tools. Contractor may be required chip and clean area along the pole line and may be required to chip and dispose of chips to the assigned City location. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |