Last Updated | 09/24/2022 07:32 AM |
Project Title | Wallops Airfield Repair Project, Field Carrier Landing Practice (FCLP) Phase 9 |
Physical Address | View project details and contacts |
City, State (County) | Wallops Island, VA 23337 (Accomack County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,677,590 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 15, 2022 Contract Award Number: 80GSFC22CA062 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Kiewit Infrastructure South CO. Contractor Awarded Address: Glen Allen, VA USA Base and All Options Value (Total Contract Value): $1677590.00 NASA intends to award a Firm Fixed Price (FFP) contract to an interested bidder. This procurement will be conducted in accordance with FAR Part 14 (SEALED BIDDING) and Part 36 (CONSTRUCTION) and will be evaluated in accordance with the procedures therein. Offerors shallcomplete blocks 14 thru 20c of the attached Standard Form 1442 and submit with their bid. For this project, in accordance with the Statement of Work, Attachment A, Specifications, Attachment B, and Drawings, Attachment C, referenced in Section J.1, the scope of work including base bid and options shall include but is not limited to: Portland cement concrete (PCC) spall repairs, full depth repairs, full slab replacements, crack sealing, joint sealing, and asphalt concrete (AC) seal coating. Wallops Airfield Repairs, FCLP Phase 9, focuses on performing routine maintenance per the recommendation from Site Specific Report - Airfield Pavement Condition Survey, Wallops Flight Facility dated September 2018. Various PCC and AC repairs to pavements associated with the Runway 28 approach, the taxiways supporting Runway 10-28, and the east B. D-001 ramp. The work to be completed shall include furnishing, as applicable or may be required, all Contractor's plant, equipment, safety devices, labor, tools, materials, supplies, and services; and performing all operations necessary to a complete project in conformity with the scope of work. This competitive procurement is anticipated to result in a Firm Fixed Price construction contract, under a full and open competition. Though the period of performance is 270 days from Notice-To-Proceed (NTP) Site Visit 52.236-27 Site Visit (Construction), Alt I. (FEB 1995). An organized site visit has been scheduled for August 11, 2022, at 10:00 am (EST). Participants will meet outside of the Wallops Flight Facility Badging Office N-001,at 34200 Fulton Street, Wallops Island, VA 23337, to receive their visitor badge. Site Visit Instructions All site visit attendees must be submitted by the Prime Contractor, including legal first name, middle initial, last names, company, citizenship, and phone number via e-mail, to Contract Specialist Tiera Greene at Tiera.M.Greene@nasa.gov and cc' Contracting Officer Maikeyza Brown at Maikeyza.Brown-1@nasa.gov no later than (NLT) 2:00 p.m. (EST), on August 5, 2022. Please ensure names of attendees submitted for badge access match EXACTLY as indicated on identification to ensure badge access to the site. Please limit site visit attendees to no more than three (5) people including any/all subcontractors. Attendees shall travel to each site location using their own personal vehicle. The Contracting Officer Representative will lead the convoy to each site location. Bid Opening Electronic bid packages must be received by Maikeyza Brown 12:00 p.m. (EST) on August 30, 2022. The bidding opening will take place August 30, 2022, at 2:00 p.m. (EST) via Microsoft Teams. If you have any questions, you may contact the undersigned by email at Maikeyza.Brown-1@nasa.gov. Anyone joining via Microsoft Teams after 2:00 p.m. local time will not be allowed to attend the bid opening. All site visit questions and IFB questions MUST be submitted in writing, electronically to Tiera.M.Greene@nasa.gov and cc' Maikeyza.Brown-1@nasa.gov on or before August 12, 2022 local time, 2:00 p.m. (EST). Bidders are encouraged to submit questions as soon as possible for consideration. It is the Bidders responsibility to monitor Sam.gov for the release of solicitation amendments (if any). Potential Bidders will be responsible for downloading their own copy of this solicitation and amendments (if any). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |