Similar Projects
Smith Creek Watershed Recovery
Bidding
Wilmington, NC 28403

South Mayo River Flood Reduction Project Rehabilitation
Post-Bid
$500,000 to $1,000,000 est. value

Storm Drain Pipe Repairs Garden Avenue
Post-Bid
Wilmington, NC 28402

Hinton Avenue Drainage Improvements
Results
Wilmington, NC

Turning Basin Expansion - 2019
Results
$35,000,000 to $40,000,000 est. value
Wilmington, NC

Amber Drive Drainage Improvements
Post-Bid
Wilmington, NC 28402

Leachate Seep and Erosion Repair Services
Results
Wilmington, NC 28401

Headwall
Results

Multiple Region - Statewide Emergency Replace or Rehab Bridges Culverts Pipes 48-Inches or Larger in Diameter] Special Notice for Ad Purchase Directory - Emergency Express Design-Build
Results

River Road Culvert Replacement
Results
Less than $1,374,080 est. value
Wilmington, NC

Shire Lane Culvert Replacement
Results
Less than $145,810 est. value
Wilmington, NC

Williston Middle School Drainage Improvements Due to Hurricane Florence
Results
Wilmington, NC

Storm Drain Pipe Point Repairs
Results
Wilmington, NC

New Orleans Place Drainage Improvements
Results
Wilmington, NC 28403

Headwall
Term Contract
Results
Castle Hayne, NC 28429

Last Updated 12/03/2018 11:03 AM
Project Title

Coastal Storm Risk Management at Carolina and Kure Beach, North Carolina

Physical Address View project details and contacts
City, State (County) Carolina Beach, NC   (New Hanover County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work shall consist of dredging, transporting, placing and shaping beach fill and performing all pre and post construction beach surveys. The borrow area for Carolina Beach is located in Carolina Beach Inlet and the borrow area for Kure Beach is located offshore approximately 1.5 miles. The estimated beach fill quantities for Carolina Beach is 600,000 CY to be placed along 10,200 LF of beach. The estimated beach fill quantities for Kure Beach is 500,000 CY to be placed along 8,100 LF of beach.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents