Similar Projects
Bridge and Approaches - SH 156
Renovation
Design
$1,696,000 est. value
Ponca City, OK 74601

US 11 - Utilities
Infrastructure
Design
$1,859,044 CJ est. value
Ponca City, OK 74601

Construction for Bridge 236AA Over Unnamed Tributary of Bols D'arc Creek
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Newkirk, OK 74647

Construction for Bridge 236AA Over Unnamed Tributary of Bols D'arc Creek
New Construction, Infrastructure
Bidding
$50,000 CJ est. value
Newkirk, OK 74647

Resurface (Asphalt) I-35 from 1.0 Mile South of US-60 Extend North Near Tonkawa and Blackwell
Post-Bid
OK

Materials Bridge 93A
Infrastructure
Post-Bid
Newkirk, OK

Joint Seal/Repair
Infrastructure
Results

Bridge Water Proof Seal
New Construction, Infrastructure
Results

Bridge Rehabilitation - US 60
Infrastructure
Design
$3,759,812 CJ est. value
Ponca City, OK 74601

Street and Waterline Improvement Project-NE Woodland to El Camino
Infrastructure
Bidding
$400,000 CJ est. value
Ponca City, OK 74601

Tonkawa Street Improvements to Various Streets
Infrastructure
Post-Bid
$370,000 est. value
Tonkawa, OK

6th Street – Fresno Ave to Hartford Ave
Infrastructure
Results
Ponca City, OK

Bridge Rehabilitation - US 60
Infrastructure
Design
$785,000 CJ est. value
Ponca City, OK 74601

RFQ Construction Manager at Risk - Tonkawa Urgent Care Clinic and Pharmacy
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Tonkawa, OK 74653

Drainage Improvements Project Joe Street, Phases 1 and 2
Infrastructure
Post-Bid
$300,000 CJ est. value
Ponca City, OK 74601

Last Updated 09/28/2022 03:02 AM
Project Title

Bridge Rehabilitation - US 60

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $901,122 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-60: Over the Chikaskia River Overflow Approx 2.1 Mile East Ofus-177. As of September 28, 2022, the project is in Design status. Anticipated letting month/year is April, 2024. Length : 0.100 Mi OKDOT - Bridge Rehabilitation - US 60 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents