Similar Projects
CHL028 Civil Site Improvements, Chena River Lakes Flood Control Project
Infrastructure
Design
$10,000,000 CJ est. value
North Pole, AK 99705

CHL028 Civil Site Improvements, Chena River Lakes Flood Control Project
Infrastructure
Design
$10,000,000 CJ est. value
North Pole, AK 99705

Fairbanks Area PM 2.5 Plug-Ins: Birch Hill, Chena Lakes, UAF
Infrastructure
Bidding
$2,500,000 CJ est. value
Fairbanks, AK 99701

Fairbanks Area PM 2.5 Plug-Ins: Birch Hill, Chena Lakes, UAF
Infrastructure
Bidding
$2,500,000 CJ est. value
Fairbanks, AK 99701

Airport Way/Cushman Street Intersection Reconstruction Appraisals
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Fairbanks, AK 99701

Dalton Hwy MP 0-9 Reconstruction CMGC
Infrastructure
Post-Bid
$30,000,000 to $40,000,000 est. value
Fairbanks, AK

Tanana Lakes Recreation Area Trailhead Kiosks
Infrastructure
Results
Fairbanks, AK 99701

RSA - Twenty-Three Mile Slough Annual Maintenance
Term Contract, Alteration
Results
Fairbanks, AK

Pioneer Park Water Supply Distribution
Infrastructure
Post-Bid
Fairbanks, AK

Old Richardson Highway Intersection Improvements
Infrastructure
Results
AK

Juanita Helms Administration Center Parking Lot Re-Striping
Infrastructure
Post-Bid
Fairbanks, AK 99701

Airport Way/Cushman Street Intersection Reconstruction
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
AK

Resurface Old Seward Highway From Dimond Boulevard to Dowling Road
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Steese Expressway/Johansen Expressway Interchange CMGC
Infrastructure
Results
$30,000,000 to $40,000,000 est. value
AK

Reconstruct the Intersection of Airport Way, Steese Expressway, Gaffney Road, and the Richardson Highway
Infrastructure
Results
$20,000,000 to $30,000,000 est. value
AK

Last Updated 07/22/2022 06:33 AM
Project Title

NR ADA Improvements - Fairbanks: 6th Avenue

Physical Address View project details and contacts
City, State (County) Fairbanks, AK 99701   (Fairbanks North Star County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $661,111 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of reconstructing ADA improvements and potentially widening the north sidewalk on the 6th Avenue in Fairbanks, Alaska. The project may also include reconstruction, roadside-hardware, drainage improvements, intersection improvements and utilities. Bidding documents are available for inspection at the DOT&PF regional office in Fairbanks. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimate is between $500,000 and $1,000,000.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents