Last Updated | 05/30/2023 03:03 PM |
Project Title | Engineering Discovery Building - CMAR |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX 78712 (Travis County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $169,650,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The University of Texas at Austin, on behalf of Capital Planning and Construction, has posted a bid opportunity for the Engineering Discovery Building project. The Project will provide approximately 210,000 GSF of critically needed space that will serve as the focus for education and research related to chemical and petroleum engineering within the Cockrell School of Engineering. The design will include flexible classrooms and open office areas to maximize flexibility. Laboratories will be designed to meet current needs for wet labs, but be as generic as possible to maximize flexibility for future uses. Abatement and demolition of the SER is a requirement of the Project. Owner may utilize design-assist subcontracting to execute the Project. The design and preconstruction team engaged in the Definition Phase will incorporate appropriate constructability expertise and may procure Design-Assist subcontractors at completion of Schematic Design or later. Owner expects constructability review and detailed cost estimating from the design team and pre-construction team throughout all phases of design. The Definition Phase is intended to clearly establish the scope approved for the Project; more completely forecast the overall anticipated costs; and define a reliable schedule with thorough constructability review and detailed cost estimating from the design team and Construction Manager-at-Risk. The preliminary CCL for the Project is $169,650,000. Fees, furnishings, equipment, other work, miscellaneous expenses, and cost of enabling sub-projects not included in the CCL comprise the PPC balance of $261M. Deadline for Questions from Respondents June 28, 2021 at noon local Time Owner may evaluate the Qualifications based on the anticipated completion of all or any portion of the Project. Owner reserves the right to divide the Project into multiple parts; to reject all Qualifications and re-solicit; or to reject all Qualifications and temporarily or permanently abandon the Project. Owner makes no representations, written or oral, that it will enter into any form of Agreement with any Respondent to this RFQ for any project and no such representation is intended or should be construed by the issuance of this RFQ. As of January 25, 2025, further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |