Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Magic City Riverfront Park - Boat Launch
New Construction
Design
North Charleroi, PA 15022

Oak Hills Park and Overdeer Park Improvements
Renovation
Bidding
$225,000 to $250,000 est. value
Middletown, PA 17057

Washington Avenue Park Upgrades Project
Renovation
Bidding
Larksville, PA

Chestnut Ridge Terrace - Pavement Repairs, Parking Lot Seal Coat, Dumpster Enclosure and Playground Equipment Replacement Project
Post-Bid
Blairsville, PA 15717

Tennis Center Court Renovation Project
Post-Bid
Mount Lebanon, PA 15228

Construction of a New Picnic Pavilion
New Construction
Results
Skippack, PA 19474

Memorial Park Expansion Phase 2
Results
Yardley, PA 19067

The Highlands at Wyomissing Expansion
Renovation, Addition - 6,000 SF
Construction
Wyomissing, PA 19610

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

Allegheny Landing Park
Renovation
Conception
Pittsburgh, PA 15212

Southside Works - Tunnel Park Playground and Dog Park
New Construction - 2,320 SF
Design
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15207

Removal of Pavilion
Renovation
Bidding
Lock Haven, PA

Last Updated 10/01/2021 11:50 AM
Project Title

Palmer Park Phases 2 and 3

Physical Address View project details and contacts
City, State (County) Coatesville, PA   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work in the Project includes the following: 1. Demolition of existing asphalt, timber wall/fence, gazebo, and playground play surface. 2. Installation of new concrete perimeter and interior sidewalks and curbing. 3. Replacement of the existing timber wall. 4. Placement of site amenities including benches, picnic tables, and benches. 5. Installation of site landscaping and grading.

Details

Park/Playground, Addition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents