Similar Projects
PVI Water Heater Replacement
Post-Bid
Blythewood, SC 29016

SC Department of Archives and History - Boilers Blowdown Separator
Post-Bid
$25,000 to $35,000 est. value
Columbia, SC 29223

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

South Carolina Archives and History Building - Replace Hot Water Heater(S)
Post-Bid
$35,000 to $40,000 est. value
Columbia, SC 29223

Boiler/Water Heater Penthouse
Results
Columbia, SC 29210

J045--Boiler Life Expectancy and Damage Assessment Inspection
Post-Bid
Columbia, SC 29209

Boilers and Pumps
Results
Columbia, SC 29208

Autoclave And Boiler Maintenance - Hollings Marine Laboratory
Post-Bid
Charleston, SC 29412

USC 1600 Hampton Street Annex Mechanical Upgrades
Results
$350,000 to $400,000 est. value
Columbia, SC 29208

R22-30 Refrigerant
Alteration
Post-Bid
Columbia, SC

Intellihot Water Heaters
Results
Columbia, SC

Steam Fired Domestic Water Heater
Results
Columbia, SC

UOFSC FY21-1206 Flora-1st Floor Mechanical UPFIT
Results
$300,000 to $400,000 est. value
Columbia, SC 29201

Blatt Building Replace Terminal Hot Water Reheat 5Th Floor & Edgar Brown Building Replace Terminal Hot Water Reheat 5Th Floor
Results
$750,000 to $900,000 est. value
Columbia, SC 29201

Last Updated 10/08/2021 04:25 AM
Project Title

Repairs to Burnham Boiler

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repairs to a Burnham Boiler 5W-125, Serial 71419. Furnish all labor, tools, equipment, materials, and insurance. Remove all boiler tubes from the boiler. Discard tubes in SCDC's supplied dumpster. After removal of the tube, inspect the tube sheet for defects. Notify SCDC of any tube sheet defects. Clean the tube sheet and polish the tube holes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents