Similar Projects
Pikes Peak Center Alley Paving
Infrastructure
Bidding
Colorado Springs, CO 80903

Asphalt Repairs
Infrastructure
Bidding
$400,000 est. value
Colorado Springs, CO

2C Extension Asphalt Overlay
Post-Bid
Colorado Springs, CO

Centennial Boulevard Extension Project
Post-Bid
Colorado Springs, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

CO FTBR Crystal Dam (1), East Portal Access Road
Results
$4,500,000 to $5,500,000 est. value
CO

Pioneer Village Road Maintenance Services
Alteration
Post-Bid
Colorado Springs, CO

Two-Inch Mill And Overlay Of On/Off Ramps At Four Interchanges In The Colorado Springs Area
Results
$1,000,000 to $5,000,000 est. value
CO

6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

30th Street - Fontanero Street to Mesa Road
Infrastructure
Post-Bid
Colorado Springs, CO 80907

Pikes Peak Greenway Trail Improvements - I25 To Cottonwood
Results
Colorado Springs, CO

Reported 04/20/2022 12:00 AM
Project Title

Adaman Alley Construction Services

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Adaman Alley project is a unique project in the heart of downtown. The Adaman Club is a club with deep roots in the history of Pikes Peak and the City of Colorado Springs. The club celebrates its 100-year anniversary December 2022. The alley project is part of the efforts to honor this very special anniversary. The City and CSU are revitalizing the underground utilities and rebuilding the alley surface. Following our work, the Adaman Club and the Downtown Partnership will continue the project by overseeing the installation of murals and other exciting aesthetic improvements. The City and CSU desire to partner with a highly skilled contractor to install new water main, new storm lines & inlets, and reconstruct the pavement in the alley.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents