Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

UC Boulder Masterplan
New Construction, Renovation
Conception
Boulder, CO 80309

Standing Order Contractor Program
Bidding
Less than $50,000 est. value
Boulder, CO 80303

2160 Project Con 2127 DTS Learning Commons Remodel
Renovation
Bidding
Colorado Springs, CO 80903

Notice #19-25-Pr010107/Hsg11132-Aden & Brkt-Maint
Renovation
Post-Bid
$750,000 est. value
Boulder, CO 80303

Cu Anschutz Pn20-125493
Renovation
Post-Bid
Less than $3,078,000 est. value
Denver, CO

Research Complex 2 - 11th Floor Renovate Rooms P15- 11450D, P15-11232 and P15-11243
Renovation
Results
$105,000 to $115,000 est. value
Aurora, CO

Mines Innovation Hub
Results
$14,300,000 est. value
Golden, CO

LCC20-05 MAP Center Remodel
Renovation
Construction
$130,000 est. value
Lamar, CO 81052

LCC 20-07 Proj #01-2019 Student Union Remodel
Renovation
Construction
$350,000 est. value
Lamar, CO 81052

Moby North Concourse Sealing
Renovation
Bidding
Fort Collins, CO 80521

UMC - Remodel Reception Desk and Room 235
Renovation
Post-Bid
$580,000 est. value
Boulder, CO

ISL Building Exterior Repair
Renovation
Results
Fort Collins, CO 80523

Notice 19-26-SLL(NPL)-FS-SwtchGr-Lab Reno Projects
Renovation
Construction
$1,500,000 est. value
Boulder, CO 80309

GC Prequalification - Labriola Innovation Complex
New Construction
Bidding
CO

Last Updated 11/30/2020 05:54 AM
Project Title

Administration Building - Expand Student Oureach Program

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81001   (Pueblo County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to update and expand the Student Outreach area. The scope includes demolition of walls, ceiling, flooring and miscellaneous equipment like mailboxes for the purpose of constructing the new plan layout. Return equipment to owner. All new construction quality shall be equal or greater than the existing building standard. No residential construction standard will be allowed. All furniture is not included in the project; however, it is the responsibility of the GC to help coordinate all MEP to meet code and final operation. Scope includes some minor mechanical alterations to accommodate the new spaces. Extension of the fire sprinkler system will be required on a design build bases.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents