Similar Projects
Rehabilitate Burma Road
Design
$5,000,000 to $10,000,000 est. value
Fort McCoy, WI

Lacrosse - Westby, Brickyard Lane to CTH M
Bidding
La Crosse, Westby, WI 54602

Pond and Drainage System Construction
Bidding
De Pere, WI

Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Concrete Culverts
Post-Bid
WI

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Baertsch Court Road Reconstruction / Resurfacing
Bidding
Fountain City, WI

Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Road Work
Bidding
Verona, WI

M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Crack Routing and Sealing
Results
Madison, WI 53703

Chip Seal
Bidding
WI

Curb and Gutter and Sidewalk Replacement
Post-Bid
Watertown, WI

Last Updated 12/11/2020 12:25 PM
Project Title

STH 60 - Montello, Columbia County Line - STH 60 - Montello, 5th Street

Physical Address View project details and contacts
City, State (County) Montello, WI 53949   (Marquette County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 22; 10.620 Miles; Milling, Asphalt Pavement, Base, Culvert Pipes, Guardrail, and Pavement Markings. Excavation Common, 4,866 CY; Base Aggregate Dense, 1,141 Ton; Marking Epoxy, 172,015 LF; Construction Staking, 55,502 LF; Construction Staking, 7 Each; Culvert Pipe Reinforced Concrete, 167 LF 24“, 126 LF 30“, 77 LF 60”; Culvert Pipe Reinforced Concrete Horizontal Elliptical, 53 LF 24“ X 38“, 63 LF 48“ X 76“; Beam Guard, 3,268 LF; Beam Guard Energy Absorbing Terminals, 12 Each; Asphaltic Surface, 5,288 Ton; HMA Pavement, 22,237 Ton; Removing Asphaltic Surface Milling, 190,072 SY; Tack Coat, 8,076 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Finishing, Exposed Aggregate Concrete Finishing.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents