Similar Projects
RFQ Construction Manager - Additions, Renovations and New Facilities
Addition, Demolition, New Construction, Renovation, Infrastructure
Design
$420,000 CJ est. value
Mahomet, IL 61853

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Construction of Boneyard Creek Segment 3 Bank Stabilization
Infrastructure
Bidding
$904,000 CJ est. value
Urbana, IL 61801

Napleton Hyundai / Urbana
Addition, Renovation, Infrastructure - 18,800 SF
Bidding
$3,500,000 CJ est. value
Urbana, IL 61802

Bituminous Surface Treatments/Seal Coating
Infrastructure
Post-Bid
$300,000 CJ est. value
Philo, IL 61864

2022 MFT Roadway Improvements
Infrastructure
Post-Bid
$270,000 CJ est. value
Philo, IL 61864

Urbana Middle And High School Site Improvements – Phase 1
Alteration
Results
$100,000 to $200,000 est. value
Urbana, IL 61801

Site Improvements at J.W. Eater Junior High School Project
Infrastructure
Results
Rantoul, IL 61866

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

Garden Hills Detention Basin Phase 2 - City of Champaign
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Champaign, IL 61820

Cedar Street Sanitary Sewer
Infrastructure
Post-Bid
$200,000 CJ est. value
Urbana, IL 61801

2022 Construction Project and the Existing Elementary School (Concrete/Site Work, Flooring, Painting, Epoxy Flooring)
Infrastructure, Alteration
Results
$200,000 est. value
Thomasboro, IL 61878

Garden Hills Detention Basin Phases 3 - City of Champaign
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Champaign, IL 61821

Drainage Improvements
Infrastructure
Results
$200,000 CJ est. value
Ogden, IL 61859

Garden Hills Detention Basin Phases 4, 5 - City of Champaign
Infrastructure
Pending Verification
$96,800,000 CJ est. value
Champaign, IL 61820

Last Updated 08/17/2022 03:10 PM
Project Title

Mahomet Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Mahomet, IL 61853   (Champaign County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $212,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Mahomet Pump Station is located off of Lake of the Woods Road behind the Village of Mahomet Parks & Recreation Building General improvements of the existing Mahomet Pump Station which includes: Updating Electrical and Controls Equipment Replacing Pumps Replacing Piping and Valving inside the Existing Vaults Questions regarding the bid documents should be directed to Donohue & Associates, Inc., Attention: Alexis Sheehan, PE. (Phone: 217-903-4438, email: asheehan@donohue-associates.com) The Contractor and subcontractors shall conform to the "Public Works Preference" Act (30 ILCS 560/1 et. Seq.). The Contractor shall also comply with the Illinois Prevailing Wage Act, the Veteran's Preference Act, the Employment of Illinois Workers on Public Works Act, and the Illinois Human Rights Act. WAGE RATES: The Sangamon Valley Public Water District has established the rates for the various classifications of workers and crafters on the proposed improvements, with said rates being as required by the Illinois Department of Labor for the county within which the work will be performed. A copy of the applicable wage rates for the area in which the work is to be completed is included in the Project Manual. The CONTRACTOR and all subcontractors shall pay wages to laborers and mechanics at a rate not less than the minimum wages specified in the Prevailing Wage Determination issued by the Illinois Department of Labor. In addition, CONTRACTOR shall provide certified payroll on a monthly basis and retain said payroll records for not less than three (3) years after the OWNER has made final payment on the project. BID SECURITY: Bid Security in the amount of not less than 5% of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. BID REJECTION/ACCEPTANCE: The Owner reserves the right to reject any and all Bids, waive informalities in bidding, or to accept the Bid or Bids, which best serves the interests of the Owner. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 60 days after the scheduled opening of the bids without the consent of Owner.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents