Similar Projects
WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Water Treatment Plant
New Construction, Infrastructure
Bidding
$6,364,000 CJ est. value
Wakefield, NE 68784

Water Treatment Plant
New Construction, Infrastructure
Bidding
$6,364,000 CJ est. value
Wakefield, NE 68784

Lyons Decatur Northeast Schools Addition
Addition, Demolition, Infrastructure - 60,000 SF
Sub-Bidding
$12,000,000 CJ est. value
Lyons, NE 68038

Regency Lake & Tennis Club
New Construction, Renovation, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68114

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Monroe Street Lift Station Improvements
New Construction
Results
Omaha, NE 68107

Burdick Pumping Station Check Valves
New Construction
Results
$55,000 est. value
Grand Island, NE

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

The Rows at Coventry
New Construction, Infrastructure
Pending Verification
$83,000,000 CJ est. value
Omaha, NE 68022

Kiewit Corporation Headquarters / Omaha
New Construction, Infrastructure - 200,000 SF
Design
$76,000,000 CJ est. value
Omaha, NE 68118

Last Updated 10/17/2022 08:13 AM
Project Title

Water Pollution Control Plant Improvements

Physical Address View project details and contacts
City, State (County) Norfolk, NE 68701   (Madison County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is briefly described as follows: Select demolition activities at the existing treatment facility that include; pre-aeration basin, grit facilities and piping, and lift station equipment and piping, associated site concrete and/or structures, grating, stairs, associated piping, valves, and controls; miscellaneous mechanical/electrical equipment, and site modifications. Construction of a Grit building and grit equipment, rehabilitation of north lift station and primary clarifier #2. Work will require bypass pumping. Construction activities include providing all necessary materials, labor, equipment, and testing for the installation and/or construction of improvement to the following: 1. Select demolition activities at the existing treatment facility that include: removing existing grit basins (2), removing existing pre-aeration basins (3), and removing existing Parshall flume basin while retaining the two-story existing grit washer building, and removing existing silo; removal of pipes, pumps and appurtenances in the North Lift Station, partial removal of 20" and 30" force main piping from the existing North Lift Station to the existing grit removal building; and decommissioning of existing irrigation well per NDEE standards. 2. Construction Activities include providing all necessary materials, labor, equipment,and testing for the installation and/or construction of improvementsto the following: a. New precast grit building and overland waste receiving station including new grit removal equipment consisting of two stainless steel vortex units, two recessed impeller grit pumps, two grit washers with screw conveyor, flow meter, and any associated valves, piping, concrete, mechanical, controls, electrical, yard piping shown and connections to the North Lift Station and existing primary clarifiers. Includesrerouting of 6-inch waste activated sludge (WAS) line from existing pre-aeration basins to the intake structure for primary clarifiers #1 and #2, and bypass back to the head of the plant. New grit building will be integrated into existing SCADA system. Also includes construction of a new overland waste receiving station that will receive truckloads of wastewater that will be pumped to the grit washers for processing. b. Non-potable water system in the existing aeration control building including pumps, piping, hydropneumatic tank and controls, electrical connections, yard piping, yard hydrant. Will also include extension of and connection to the potable water system with all associated valves, backflow prevention controls and piping to serve as a backup if non-potable water is not available due to maintenance. The non-potable system will serve the grit washers in the new grit building, the new overland waste receiving station both for fluidizing the offloaded wastewater and a yard hydrant for washing the truck offloading area. A nonpotable line will be run to the North Lift Station for potential future use. c. Rehabilitation of the North Lift Station including replacement of all piping,appurtenances, pumps and electrical equipment inside the existing structure, rehabilitation of the mechanical systems for the North Lift Station building, and replacement of the east door. Work in the existing wetwell will require bypass piping. d. Primary Clarifier #2 rehabilitation including cleaning and recoating of the equipment mechanisms, and rebuilding drive unit. e. Plant SCADA system modifications and reconnections. f. Project work shall include all required spare parts as listed in the specifications. 3. SWPPP, Floodplain development, Fire Marshal, and other permitting implementation. 4. All work complete with bypass pumping ofselected processes, connectionsto existing structures, sidewalks or paved roadways, site grading, erosion control, seeding, yard piping, buried valves, architectural building modifications, mechanical/electrical/control components, demolition/modification, and other items of miscellaneous work which are either shown on the plans or in the Contract Documents to complete the Work

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents